Dake Corporation
724 Robbins Road
Grand Haven, MI 49417
www.dakecorp.com
7
REV012019
SET UP
TRANSPORTING AND MOUNTING
When you receive your machine, you will need a forklift for transporting. When lifting the
machine, a sling needs to be used.
Position the machine on a firm cement floor, keeping a minimum distance from 2-1/2 feet from
any wall.
ASSEMBLING THE MACHINE
The following parts will be with your machine upon receiving: Handle and stock stop.
Removing the shipping bolt and screw the handle in the hole. There is a white plug that comes
out of the handle, plug this into its receptacle located on the side of the electrical box. There is a
lever in this attachment, move it to the closed position.
Shipping Bolt
Lever in closed position