Installation
B.1.
Location
B.1.1.
Before
installing
and
running
the
unit,
please
check
the
following:
1.
There
must
be
enough
space
for
the
unit
installation
and
maintenance.
Please
refer
to
the
figure
at
the
bottom
of
this
page
for
the
unit's
outlines
and
dimensions
and
for
the
minimum
distance
between
the
unit
and
its
surroundings.
2.
Please
ensure
there
is
enough
space
for
piping
connections
and
electrical
wiring.
3.
Check
whether
the
hanging
rods
can
support
the
weight
of
the
unit
(see
specification
table
for
weight
of
the
unit).
4.
The
unit
must
be
installed
horizontally
to
ensure
proper
operation
and
condensate
draining.
5.
The
external
static
pressure
of
the
ducting
must
be
within
the
unit’s
static
pressure
range.
6.
Confirm
that
the
unit
has
been
switched
OFF
before
installing
or
servicing
the
unit.
Unit
Installation
B.1.2.
1.
The
unit
is
designed
to
be
installed
in
a
concealed
ceiling.
Installation
and
maintenance
should
be
performed
by
qualified
personnel
who
are
familiar
with
local
codes
and
regulations,
and
are
experienced
with
this
type
of
appliance.
2.
Please
refer
to
the
pictures
below
as
they
illustrate
the
installation
procedure.
Caution:
Make
sure
the
top
of
the
unit
is
level
after
installation.
The
drain
pan
is
designed
with
a
slight
gradient
to
facilitate
drainage.
Содержание FDLA-09
Страница 1: ...SK2018 GLOBAL FDLA V P AC 001 FDLA V P AC MOTOR...
Страница 27: ...Page 26 of 51 SK2018 GLOBAL FDLA V P AC 001 Configuration Settings...
Страница 53: ...FDHD V P AC MOTOR...
Страница 69: ...B 1 4 4 Electrical connections T Configuration standard version...
Страница 74: ...Wiring Diagram D 2 SK NCPDWH 001b S Configuration Full Control PCB...
Страница 76: ...Configuration Settings D 3...
Страница 111: ......
Страница 112: ...SK2019 FCSD H V P ECM 001 FCSD H V P ECM MOTOR...
Страница 140: ...Page 28 of 77 SK2019 FCSD H V P ECM 001 For 2 pipe system with modulating valve For 4 pipe systems with modulating valve...
Страница 190: ...SK2019 FCSD H V P ECM 001...
Страница 191: ...Page 1 of 59 SK2015 FMCD V EC 001 FMCD ECM MOTOR...
Страница 210: ...Page 20 of 59 SK2015 SWC V EC 001 D 1 3 Wiring Diagram SK NCSWC 001...
Страница 231: ...Page 41 of 59 SK2015 SWC V EC 001 D 3 4 Unit Network Wiring Scheme Wiring diagram for a master slave network connection...
Страница 233: ...Page 43 of 59 SK2015 SWC V EC 001 D 4 2 Wiring diagram SK NCSWC 002...
Страница 248: ...Page 58 of 59 SK2015 SWC V EC 001 Troubleshooting Guide E 4...
Страница 249: ...Page 59 of 59 SK2015 SWC V EC 001...
Страница 250: ...FSTD C V P ECM MOTOR...
Страница 256: ...Page 7 of 73 SK2015 FSTDC V P ECM 001 A 2 Unit Appearance FSTDC VAR FSTDC HAR FSTD...
Страница 278: ...Page 29 of 73 SK2015 FSTDC V P ECM 001 C 2 Wiring Diagram SK NCPFWB 001 ECM S Configuration Full Control PCB...
Страница 305: ...Page 56 of 73 SK2015 FSTDC V P ECM 001 E 4 Wiring Diagrams E 4 1 Standard Unit Wiring Diagram of SK NCPFWB 002 ECM...
Страница 322: ...Page 73 of 73 SK2015 FSTDC V P ECM 001...