229
GB
4.4.3 Closing the back box
If the IR beam units SH102AX or SH103AX (with built-in radio transmitters), are to be extended or stacked with slave IR beams
SH100AX or SH101AX (without built-in radio transmitters), continue the installation with chapter
“4.5 Interconnecting multiple non
radio beam sets”
, if not close the case and go to chapter
“5. Configuration and adjustments of infra-red detection”
.
1.
Hang the back box to the bottom of the base.
2.
Close the box.
3.
Tighten the fixing screw.
1
3
2
5.
Position the base on the post with
anti-tamper pin
positioned at the top
then to fix it to post using the
screws and the “U” clamp (provided).
Module 1
Module 2
6. CAUTION: ensure the base is firmly and correctly fixed to the
post to ensure correct operation of the anti-tamper pin and
micro-switch.
“U” clamp
Screws M4x30
Anti-tamper pin
Содержание SH100AX
Страница 1: ...Upgraded for e Nova applications...
Страница 42: ...252 GB Dimensions 164 5 mm 217 07 mm 239 mm 88 mm 83 5 mm...
Страница 44: ...254 GB...
Страница 45: ...255 GB...
Страница 46: ...256 GB...
Страница 47: ...257 GB...
Страница 48: ...258 GB...
Страница 49: ...259 GB...
Страница 50: ...805184 B 07 2013...