background image

 

www.daisalux.com 

29

 

LPS24 

– USER MANUAL 

 

Not communicated:

 this setting must be used if conventional luminaires are connected 

to the circuit’s output. It provides voltage at its output during tests, 

auxiliary switch 

on or power failure. It also enables voltage to be provided in the absence of power. 

 

Beacons:

 

this setting must be used if beacons are connected to the circuit’s output. It 

provides voltage at its output during tests, auxiliary switch on or power failure. It also 
enables voltage to be provided in the absence of power. There are several dimming 
configurations on the output. 

I  warn:

  Overload  alert  limit.  If  the  current  demanded  by  the  load  circuit  exceeds  this 

value, a fault will be generated in the circuit. 

I measured:

 

Instantaneous measurement of the circuit’s current

 

Mode:

 

configure the circuit’s behaviour in the presence of power supply. 

For circuits of 

the  

type “ELC” the configuration is performed on all luminaires of the circuit.

 

 

Maintained:

  when  power  is  present,  voltage  is  supplied  to  the  load  connected  to  its 

output. 

 

Non maintained:

 when power is present, voltage is not supplied to the load connected 

to its output. 

 
 
 
 

 
   
 

Delay to alert:

 set a time delay for the entire circuit on the return to alert. Not available 

for  “

ELC

”  type  circuits  because  in  such  circuits  configuration  should  be  made  at  the 

luminaire level. 

P. lum fail:

 

only available for “

Non-communicated type

” circuits. Deactivate or 

configure 

a  threshold  in  watts  (w)  to  generate  an  alarm  if  consumption  is  above  or  below  the 
threshold once calibrated. 

Recalibrate:

 

only  available  for  “

Non-communicated  type

”  circuits.  Calibrate  the 

consumption of the circuit to obtain the reference value. 

DBR:

 

Only available for “

beacons type

” circuits. Configures whether the circuit attends to 

the activation of the DBR signal. If it attends to the signal, when it is active it performs a 
variable switch on from the DBR min dimming value to the DBR max dimming value. 

External  dimming:

 

only  available  for  “

beacons  type

”  circuits.  Configures  whether  the 

circuit serves the analogue input (0-10 v) to dim the circuit when connected to power. 

Alert  dimming:

 

percentage  of  dimming  in  the  presence  of  mains.  Only  available  for 

beacons type

” circuits.

 

Emerg  dimming:

  percentage  of  dimming  in  the  absence  of  mains.  Only  available  for 

beacons  type

” circuits.

 

DBR  min  dimming:

  minimum  percentage  of  dimming  during  DBR  activation.  Only 

available for “

beacons type

” circuits.

 

DBR  max  dimming:

  maximum  percentage  of  dimming  during  DBR  activation.  Only 

available for “

beacons type

” circuits.

 

 

 

It  is  only  an  initial  configuration,  if  after  by  another  means  (time 

switch, an auxiliary input configuration) circuit switch on or switch off 
is ordered, the new order will take precedence. 

 

Configuring  an  auxiliary  input  with  the  “

on/off

”  behaviour  takes 

precedence over this configuration. 

Содержание LPS24

Страница 1: ...V20200515 F8 LPS24 USER MANUAL Centralised emergency lighting device...

Страница 2: ...V20200515 F8...

Страница 3: ...S24 device 14 6 3 3 2 Remote fault connection to several LPS24 devices 15 6 3 4 Dry contacts CLP1 CLP4 15 6 3 5 Input 0 10V 17 6 3 6 Remote control TELEM 17 6 3 7 LPSLan 18 7 Switching on the LPS cent...

Страница 4: ...roubleshooting 35 10 1 Output problems 35 10 1 1 Short circuit on the outputs 35 10 1 2 Over consumption in the outputs 35 10 1 3 Electronic fault in the outputs 35 10 2 Functional problems 35 10 2 1...

Страница 5: ...The use of unauthorised or inappropriate components in conjunction with the emergency lighting system Incorrect installation 1 3 Parts Defective components may only be replaced by original DAISALUX pa...

Страница 6: ...1 Operating instructions Always read the instructions for mounting and start up before installing the system These instructions contain important information about safety use and maintenance and prot...

Страница 7: ...nalogue input 0 to 10V to regulate the brightness of one or more outputs defined as beacons Four auxiliary inputs configurable by the user Optional Ethernet or wireless connection module By LPSLan acc...

Страница 8: ...4 USER MANUAL 4 1 Design and structure of the LPS centralised power unit LPS24 26 LPS24 65 1 Cable input 2 Connections 3 Control Panel 4 Converter 230 or 110VAC 24VDC 5 Battery Type of centralised pow...

Страница 9: ...of discharge is estimated remaining duration less than 10 mins Stopping Occurs in any of the following situations Battery open or in bad state Incorrectly connected battery Battery voltage equal or le...

Страница 10: ...150 Protection Overcurrent 4 1 A Overvoltage 34V Short circuit 12 24 A constant current up to thermal protection Self resetting detection 20s Overtemperature 80 C Protection of outputs from overtempe...

Страница 11: ...that the wall where it is installed is strong enough to support the weight of the entire centralised power unit and that the mountings used are adequate to support the weight The batteries are not in...

Страница 12: ...s soon as possible After assembling the centralised power unit remove the battery fuse before proceeding with the following points Then connect the battery cables and terminals supplied When connectin...

Страница 13: ...exceed the system output power See 5 Technical data Check the compatibility of each luminaire connected to an output circuit configured as beacons as not all beacons allow such functionality The ELC...

Страница 14: ...witching on all luminaires due to power failure in another part of the facility Switch On off Switching on on activation of the input or off on deactivating the input the circuits associated to the au...

Страница 15: ...ere are four dry contacts three of them fixed according to the EN 50171 standard and the fourth configurable by the user Available options Option details Default configuration of the contacts 1 2 3 4...

Страница 16: ...on test is scheduled to run on a particular date Battery charge failure Battery charge regulation fault x x Rectifier failure Failure in the rectifier x x Battery discharging Battery discharging x End...

Страница 17: ...d through the display by selecting the percentage desired by circuit or by this 0 10V input which is controlled by an analogue signal from 0 to 10V or potentiometer 30K the latter is not linear Regula...

Страница 18: ...fuses Activate the main power supply Before performing any operating test make sure to charge the batteries for at least 24 hours Configure the circuit according to the desired load ELC luminaires bea...

Страница 19: ...circuit the battery must be disconnected from the system and the emergency lighting system will not be available therefore it must only be performed when failure of the emergency lighting system does...

Страница 20: ...dules power input rectifier contactor battery and output circuits To access the system s menu press OK Overview On the different screens there are a number of symbols that can be pressed for different...

Страница 21: ...e 24 3 C Charge 100 20 0Ah Status ok Gen Bat Rect Fails Vbat Battery voltage VbatInt Mid battery voltage To determine whether the two batteries are balanced Ibat Battery charge discharge current Tempe...

Страница 22: ...Rect FAILURES Low security Gen Bat Rect Fails List of faults and alerts detected in the device See 8 2 7 1 faults marked with are those that can be seen on this screen 8 2 2 Test 8 2 2 1 Function tes...

Страница 23: ...ast test 07 05 16 100 Automatic yes Period days 365 Test Time 23 30 Weekday Sunday Status on course Schedule test 07 12 2016 Run test Func Dur Cap Last test Indicates the date mm dd yy and result of t...

Страница 24: ...tes the simulated consumption with which the capacity test is performed Cancel Launch test It enables a capacity test to be ordered or cancelled if it is running One option or another or none is displ...

Страница 25: ...nge of daylight saving time European change to daylight saving time on the last Sunday of March and back to winter time on the last Sunday in October Other change to daylight saving time according to...

Страница 26: ...have been configured it connects terminals 1 and 2 Configurable alerts System working Mains failure 8 2 3 3 Auxiliary inputs The LPS24 device has four auxiliary inputs Use this screen to check their s...

Страница 27: ...device the above information will not appear and instead the text no gateway will be displayed Overview OK Main menu Config OK Gatew OK GATEWAY BOARD Reset web server Mode DCHP IP address 192 168 106...

Страница 28: ...t some point has exceeded the alert limit for overload Check the load connected to the circuit and to correct it run a circuit test section 12 1 1 Electronic fail fault in electronic circuit component...

Страница 29: ...e made at the luminaire level P lum fail only available for Non communicated type circuits Deactivate or configure a threshold in watts w to generate an alarm if consumption is above or below the thre...

Страница 30: ...he luminaires will be displayed not located and 1 to 6 Serial number select with and the various luminaires on the selected circuit Status displays the status of the ELC luminaire Communication loss t...

Страница 31: ...rly if it is running Battery charge 100 send a command to the device to place the battery charge estimate to 100 Uninstall lumin if there is any uninstallable luminaire to be uninstallable it must hav...

Страница 32: ...e of scenario Action action to execute when the scenario runs The scenarios screen can display only the scenarios programmed on the device To generate a scenario use the WinCB software or the LPSLAN m...

Страница 33: ...test Circuit test on course The device is running a circuit test Duration test required The duration test period has transpired without a test having been performed A test must be run to check the sys...

Страница 34: ...inspections With the aim of maintaining equipment in optimal operating conditions annual inspection is recommended EN50171 requires at least one installation test during this period of time 9 1 2 Defi...

Страница 35: ...its stipulated in this manual A circuit test can be conducted to verify that the voltage connected to said outlet is correct 10 1 2 Over consumption in the outputs If the device has signalled an outpu...

Страница 36: ...device because the total power demanded exceeds the maximum admissible for the device Once the device s load is adjusted run a functional test to eliminate the overload alarm If the fault persists ca...

Страница 37: ...tery duration fault When the device notifies a duration fault check the following Device s output power must be within the ranges described in this manual If the power is excessive it is outside of sp...

Страница 38: ...nd an installation of devices and emergency equipment using the ON OFF button on the front panel The basic operation in the absence of POWER is OFF sends a command to the LPS24 devices to go to standb...

Страница 39: ...www daisalux com 39 LPS24 USER MANUAL B SCH...

Отзывы: