20
|
Configuration
Installer and user reference guide
113
RXYLQ10~14T7Y1B*
VRV IV system air conditioner
4P543427-1A – 2020.10
20 Configuration
In this chapter
Energy saving and optimum operation.................................................................................................................................. 126
20.3.1
20.1 Overview: Configuration
This chapter describes what you have to do and know to configure the system after
it is installed.
It contains information about:
▪
Making field settings
▪
Using the leak detection function
INFORMATION
It is important that all information in this chapter is read sequentially by the installer
and that the system is configured as applicable.
DANGER: RISK OF ELECTROCUTION
20.2 Making field settings
20.2.1 About making field settings
To continue the configuration of the VRV IV heat pump system, it is required to
give some input to the PCB of the unit. This chapter will describe how manual input
is possible by operating the push buttons/DIP switches on the PCB and reading the
feedback from the 7‑segment displays.
Making settings is done via the master outdoor unit.
Next to making field settings it is also possible to confirm the current operation
parameters of the unit.
Содержание VRV IV
Страница 155: ......
Страница 156: ...4P543427 1A 2020 10 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...