18
|
Piping installation
Installer and user reference guide
86
RXYSA4~6A7V/Y1B
VRV 5-S system air conditioner
4P600330-1 – 2020.01
a
d
b
c
a
Front
b
Side
c
Rear
d
Bottom
INFORMATION
b
b
b
b
a
a
▪
Remove the knockout hole (a) in the bottom plate or cover plate by tapping on
the attachment points with a flat head screwdriver and a hammer.
▪
Optionally, cut out the slits (b) with a metal saw.
NOTICE
Precautions when making knockout holes:
▪
Avoid damaging the casing and underlying piping.
▪
After making the knockout holes, we recommend to remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
▪
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
3
Do the following:
▪
Connect the accessory liquid pipe (a) to the liquid stop valve (brazing).
▪
Connect the accessory gas pipe (b) to the gas stop valve (brazing).
a
b
Содержание VRV 5-S Series
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ...4P600330 1 2020 01 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...