Domestic hot water tank for Daikin Altherma Monobloc (R32)

 

 

 

Typical workflow

 

Installation typically consists of the following stages:

 

1.

 

Siting the domestic hot water tank.

 

2.

 

Connecting the water piping.

 

3.

 

Connecting the electrical wiring.

 

4.

 

Finishing the domestic hot water tank installation.

 

4.2

 

Siting  the domestic hot water tank

 

4.2.1

 

Installing the domestic hot water tank

 

1.

 

Check if all domestic hot water tank accessories are enclosed

 

2.

 

Place the domestic hot water tank on a level surface. Make sure 
the tank is mounted level.

 

4.3

 

Connecting the water piping

 

4.3.1

 

About connecting the water piping

 

Typical workflow

 

Connecting the water piping typically consists of the following stages:

 

1.

 

Connecting the water piping.

 

2.

 

Filling the domestic hot water tank

 

3.

 

Insulating the water piping.

 

4.3.2

 

Connect the water piping

 

Position the inlet control group so that the discharge from both safety valves 
can be joined together via a 15mm end feed Tee. Connect the tundish and 
route the discharge pipe. The discharge pipe work must be routed in 
accordance with Part G3 of schedule 1 of the Building Regulations. The 
information that follows is not exhaustive and if you are in doubt you should 
seek advice. The two safety valves will only discharge water under fault 
conditions. When operating normally water will not be discharged. The tundish 
should be vertical, located in the same space as the unvented hot water storage 
system and be fitted as close as possible to, and lower than, the safety device, 
not more than 600mm of pipe between the valve outlet and the tundish.

 

Any discharge should be visible at the tundish. The tundish should be located 
such that and discharge is visible. In addition, where discharges from safety 
devices may not be apparent, i.e. people with impaired vision or mobility, 
consideration should be given to the installation of a suitable safety device to 
warn when discharge takes place i.e. electronically operated.

 

WARNING

 

The discharge pipes from the pressure relief valves MUST terminal 
in a safe and visible position without forming any risk to persons in 
the vicinity.

 

WARNING

 

• 

Discharge piping, tundish, drain valves, etc. must be positioned 
away from any electrical components.

 

• 

The discharge pipe away from the tundish must terminate in a 
safe, visible position without forming any risk to persons in the 
vicinity.

 

WARNING

 

• 

Do NOT install any valves between the domestic hot water tank 
and relief valves/expansion vessel

 

• 

Do NOT install shut

-

off valves between expansion relief valve and 

the domestic hot water tank

 

NOTICE

 

• 

Where the secondary return circuits are used, an additional 
expansion vessel may be required.

 

• 

All pipework and fittings must be flushed free of flux and debris 
prior to installing the domestic hot water tank kit. Failure to do 
this may cause irreparable damage to the tank kit controls. Flush 
the system by opening the hot water tap.

 

• 

The tundish pipework must be a 22 mm metal pipe with a 
minimal vertical length of 300 mm below the tundish before any 
elbows or bends in the pipework. All pipework must have a 
continuous fall of 1 in 200 thereafter. Maximum permitted 
(equivalent) length of 22 mm pipework is 9m. Each bend or 
elbow is equivalent to 0.8m of pipework.

 

Sizing of copper discharge pipe D2 for common temperature relief valve outlet 
sizes:

 

(a)

 

The maximum allowed resistance is expressed as a length of straight 
pipe (i.e. no elbows or bends).

 

If in any doubt, refer to Building Regulations G3.

 

Before installation

 

Locate the domestic hot water tank in a suitable to facilitate the installation of 
water supply, discharge fittings and pipework. It is therefore recommended to 
first read through this whole procedure.

 

In the box all the needed components for G3

-

compliance have been installed 

from the factory.

 

1.

 

Connect the cold water mains to the pipework

 

Valve outlet 

size

 

Discharge 

pipe size D1

 

Discharge 

pipe size D2 

from tudish

 

Maximum 

resistance (a)

 

Resistance 
created by 

each elbow or 

bend

 

15 mm

 

15 mm 

 

22 mm

 

Up to 9 m

 

0.8 m

 

NOTICE

 

The temperature and pressure valve is factory installed on the tank. 
Do NOT remove the temperature and pressure valve.

 

2.

 

Connect the hot water outlet from the tank to the hot water means of the 
house

 

3.

 

Connect a metal discharge pipe from the tundish. Refer to 

Discharge pipe 

requirements

” 

in this chapter. All pipework must have a continuous fall and 

be fitted conforming to the requirements of the building regulations G3.

 

4.

 

The expansion vessel must be connected to the valve block: Remove the 
plug (¾—female) (see illustration below) and use appropriate pipework to 
connect the expansion vessel in a vertical position and fully supported for 
it

s weight.

 

Содержание UK.PPC150SL/R32

Страница 1: ...Altherma R32 Monobloc Systems Installation Manual UK PPC150SL R32 UK PPC150 R32 UK PPC180SL R32 UK PPC180 R32 UK PPC210 R32 UK PPC250 R32 UK PPC300 R32 English Installation Manual Domestic hot water...

Страница 2: ...that nobody especially children can play with them Possible risk suffocation DANGER RISK OF BURNING Do NOT touch the refrigerant piping water piping or internal parts during and immediate after operat...

Страница 3: ...rical DANGER RISK OF ELECTROCUTION Turn OFF all power supply before removing the switch box cover connecting electrical wiring or touching electrical parts Disconnect the power supply for more than 1...

Страница 4: ...5 consecutive days after installation Domestic hot water tank Standstills In cases where during longer periods of time there is no consumption of hot water the equipment MUST be flushed with fresh wa...

Страница 5: ...mponents The discharge pipe away from the tundish must terminate in a safe visible position without forming any risk to persons in the vicinity WARNING Do NOT install any valves between the domestic h...

Страница 6: ...must be installed by a qualified electrician The fuse rating should be sized correctly to suite the heater s duty and isolators must be double pole to BS 3456 Correct cable sizing must be carried out...

Страница 7: ...4 5 5 Parts List 4 5 6 Plan View and Dimensions Allow 300mm space in front for servicing immersion heater...

Страница 8: ...the factory the pre plumbed cylinder will be supplied with the vessel as a hydraulic separator In order to change the vessel to function only as a volumiser use the following configuration NOTICE On B...

Страница 9: ...d protection devices are installed according to this document and have not been bypassed There are NO loose connections or damaged electrical components in the switch box The immersion heater circuit...

Страница 10: ...tic cover of the pressure reducing valve 2 Extract the cartridge with the aid of long nosed pliers to grip the heat of the set screw 3 Remove the strainer element 4 Clean the strainer element and cart...

Страница 11: ...device such as a timer or connected to a circuit that is regularly turned ON and OFF by the utility 10 3 Solving problems based on symptoms 10 3 1 Symptom No water flow from hot taps Possible causes C...

Страница 12: ...the Dixell control panel We recommend the setpoint to be 37o C however it could be changed based on your requirements e g if using low temperature heat emitters If there is no possibility for water ci...

Страница 13: ...UK PPC150 300 SL R32 November 2022 Version 2 1 Domestic hot water tank for Daikin Altherma Monobloc R32 12 Technical data 12 1 Components Domestic hot water tank 12 2 Exploded Diagram...

Страница 14: ...eight kg 46 56 59 71 86 Material inside cylinder Stainless steel 2304 Water inlet H E mm 28 Piping connections diameter Water outlet H E mm 28 Cold water in mm 22 Hot water out mm 22 Domestic hot wate...

Страница 15: ...and applicable for a certain product or domain Service company Qualified company which can perform or coordinate the require service to the product Accessories Labels manuals information sheets and eq...

Страница 16: ...Appendix Wiring Connections Factory Fitted Wiring Wiring when using Madoka BRC1HHD Controller...

Страница 17: ...Third Party Thermostat 1 Zone Wiring when using Third Party Thermostat 2 Zones Third party controller must be volt free and TPI disabled Cable must be sized for 230V Third party controller must be vol...

Страница 18: ...and Service Record Log Book CUSTOMER DETAILS NAME ADDRESS TEL No IMPORTANT 1 Please keep the Log Book in a safe place for future reference 2 This Log Book is to be completed in full by the competent p...

Страница 19: ...VALVE AND EXPANSION VALVE FITTED AND DISCHARGE TESTED YES NO IS PRIMARY ENERGY SOURCE CUT OUT FITTED NORMALLY 2 PORT VALVE YES NO WHAT IS THE PRESSURE REDUCING VALVE SETTING IF FITTED YES NO WHERE IS...

Страница 20: ...ENTS SIGNATURE SERVICE 2 DATE ENGINEER NAME COMPANY NAME TEL No COMMENTS SIGNATURE SERVICE 3 DATE ENGINEER NAME COMPANY NAME TEL No COMMENTS SIGNATURE SERVICE 4 DATE ENGINEER NAME COMPANY NAME TEL No...

Страница 21: ...UK PPC150 300 SL R32 November 2022 Version 2 1 Domestic hot water tank for Daikin Altherma Monobloc R32...

Страница 22: ...Daikin UK 1 The Heights Brooklands Weybridge Surrey KT13 0NY...

Отзывы: