![Daikin Split Comfora R32 Скачать руководство пользователя страница 115](http://html1.mh-extra.com/html/daikin/split-comfora-r32/split-comfora-r32_service-manual_2459095115.webp)
2
|
Components
Service manual
115
ATXP20~35 + FTXP20~71 + ARXP20~35 + RXP20~71
Split Comfora R32
ESIE18-01C – 2020.07
3
When installing the complete set of thermistors wired to the same connector:
▪
Install all other thermistors wired to the connector in their thermistor
holder,
▪
Route the thermistor harness of all thermistors towards the appropriate
PCB,
▪
Connect the thermistor connector to the appropriate PCB.
WARNING
When reconnecting a connector to the PCB, make sure to connect it on the correct
location and do NOT apply force, as this may damage the connector or connector
pins of the PCB.
4
Fix the thermistor harness using new tie straps
5
Install the insulation around the thermistor.
6
Fix the insulation and the thermistor wire using new tie straps.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
2.14.2 Other thermistors
Checking procedures
To perform a mechanical check of the room thermistor
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
92].
1
Locate the thermistor and remove the insulation if needed. Check that the
thermistor is correctly installed and that there is thermal contact between the
thermistor and the PCB.
Is the thermistor correctly installed
(thermal contact between the
thermistor and the PCB)?
Action
Yes
Perform an electrical check of the
specific thermistor, see
115].
No
120].
To perform an electrical check of the room thermistor
Prerequisite:
First perform a mechanical check of the thermistor, see
115].
1
Locate the thermistor.
Содержание Split Comfora R32
Страница 163: ......
Страница 164: ...ESIE18 01C 2020 07 Copyright 2019 Daikin Verantwortung für Energie und Umwelt ...