Test Operation
SiUS39-601
64
Test Operation
1.
Test Operation
1.1
Procedure and Outline
Follow the following procedure to conduct the initial test operation after installation.
1.1.1 Check Work Prior to Turn Power Supply on
1.1.2 Turn Power on
Turn outdoor unit power on.
Carry out field setting on
outdoor PC board
Turn indoor unit power on.
(V3056)
{
Be sure to turn the power on 6 hours before starting operation to protect
compressors. (to power on clankcase heater)
{
For field settings, refer to “Field Settings” on and after P81.
After the completion of field settings, set to “Setting mode 1”.
Содержание RXYQ72
Страница 16: ...SiUS39 601 Specifications 5 Part 2 Specifications 1 Specifications 6 1 1 Outdoor Units 6 1 2 Indoor Units 11...
Страница 115: ...Field Setting SiUS39 601 104 Test Operation...
Страница 227: ...Troubleshooting OP Unified ON OFF Controller SiUS39 601 216 Troubleshooting...
Страница 231: ...Piping Diagrams SiUS39 601 220 Appendix 1 Piping Diagrams 1 1 Outdoor Unit RXYQ72M 96M...
Страница 235: ...Wiring Diagrams for Reference SiUS39 601 224 Appendix 2 2 Field Wiring RXYQ72 96MTJU C 3D042647B...
Страница 236: ...SiUS39 601 Wiring Diagrams for Reference Appendix 225 RXYQ144 168 192MTJU C 3D050353A...
Страница 239: ...Wiring Diagrams for Reference SiUS39 601 228 Appendix FXAQ07M 09M 12M 18M 24MVJU FXHQ12M 24M 36M 3D046039C 3D048116...
Страница 240: ...SiUS39 601 Wiring Diagrams for Reference Appendix 229 FXLQ12M 18M 24MVJU FXNQ12M 18M 24MVJU 3D045644A...
Страница 249: ...Example of Connection SiUS39 601 238 Appendix...
Страница 255: ...Method of Replacing The Inverter s Power Transistors and Diode Modules SiUS39 601 244 Appendix...
Страница 265: ...Precautions for New Refrigerant R 410A SiUS39 601 254 Precautions for New Refrigerant R 410A...
Страница 269: ...SiUS39 601 iv Index...