![Daikin RXP50N5V1B Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/daikin/rxp50n5v1b/rxp50n5v1b_installers-reference-manual_2459930038.webp)
7
|
Piping installation
Installer reference guide
38
RXF50~71D5V1B
R32 split series
4P519439-18T – 2022.06
a
b
c
a
Flare’s inner surface MUST be flawless.
b
The pipe end MUST be evenly flared in a perfect circle.
c
Make sure the flare nut is fitted.
7.2.6 Using the stop valve and service port
CAUTION
Do NOT open the valves before flaring is complete. This would cause refrigerant gas
leakage.
To handle the stop valve
Take the following guidelines into account:
▪
The stop valves are factory closed.
▪
The following figure shows the stop valve parts required when handling the
valve.
c
d
a
b
a
Service port and service port cap
b
Valve stem
c
Field piping connection
d
Stem cap
▪
Keep both stop valves open during operation.
▪
Do NOT apply excessive force to the valve stem. Doing so may break the valve
body.
▪
ALWAYS make sure to secure the stop valve with a spanner, then loosen or
tighten the flare nut with a torque wrench. Do NOT place the spanner on the
stem cap, as this could cause a refrigerant leak.
a
b
a
Spanner
b
Torque wrench
▪
When it is expected that the operating pressure will be low (e.g. when cooling
will be performed while the outside air temperature is low), sufficiently seal the
flare nut in the stop valve on the gas line with silicon sealant to prevent freezing.
Silicon sealant, make sure there is no gap.
Содержание RXP50N5V1B
Страница 1: ...Installer reference guide R32 split series RXP50N5V1B RXP60N5V1B RXP71N5V1B...
Страница 70: ......
Страница 71: ......