13
4.3
Assembly
The boiler can be hung to the wall using :
•
the wall suspension strip and a the connection kit EKVK4AA
•
a B-pack including an expension vessel and a connection kit.
4.3.1
Assembling suspension strip and assembly bracket
•
Make sure the construction of the wall is suitable for hanging the boiler.
•
Drill the holes for the suspension strip and the connection kit in the wall
using the template delivered with the boiler.
•
Mount the suspension strip and the assembly bracket horizontally on the
wall, using the associated attachment materials.
•
The boiler can now be placed on the suspension strip simultaniously sliding
the pipes of the boiler into the valves in the assembly bracket.
4.3.2
Assembling B-pack
•
Make sure the construction of the wall is suitable for hanging the boiler and
B-pack.
•
Drill the holes for the B-pack kit in the wall using the template delivered
with the boiler.
•
Mount the B-pack on the wall using the associated attachment materials.
•
Place the assembly bracket in the frame as described in the manual
inclued in the B-pack.
•
Connect the flexible hose on the expension vessel and the conenction on
the return valve. Make sure the seal rings are placed !
•
The boiler can now be placed on B-pack simultaniously sliding the pipes of
the boiler into the valves in the assembly bracket.
Содержание ROTEX GW-20 H12
Страница 1: ...ROTEX 4P374380 1D 88554801 02 2016 4P374380 1D 88554801 02 2016...
Страница 29: ...30...
Страница 81: ...30...
Страница 133: ...30...
Страница 185: ...30...
Страница 237: ...30...
Страница 290: ...30...
Страница 342: ...30...
Страница 395: ...31...
Страница 421: ...57...
Страница 422: ...58...
Страница 423: ...59...
Страница 424: ...ROTEX 008 1548799_00 88554803 05 2018 4P374380 1D 88554801 02 2016...