![Daikin Modular Rotary Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/daikin/modular-rotary/modular-rotary_instructions-for-installation-use-and-maintenance-manual_3689905024.webp)
24
20 cm
ø 55 mm
OK!
ø 48 mm
ø 60,3 mm
ø 3,25 mm
ø 5,15 mm
INNOCENTI
2”
OK!
The equipment must be lifted using tubes (not
supplied) inserted into the holes provided on the
apparatus (ø holes = 60 mm).
The type and diameter of the lifting tubes de-
pend on the weight of the machine to handle. It
is the transport operator's responsibility to make
the right choice.
Use steel tubes that are in good condition and
undamaged.
The ends of the lifting tubes must be closed me-
chanically to prevent them from coming out of
the holes provided.
Position the lifting ropes as shown in the figure,
in the part of the tube nearest the equipment.
Lifting non-palletised equipment
If transport is done using a pallet truck make sure it is suitable for the weight and size of the ma-
chine. Insert the forks into the points provided for handling (usually in a central position) so as to
keep the centre of gravity of the load in balance. Move the equipment carefully, avoiding sudden
movements.
OK!
Lifting using a pallet truck
OK!
Содержание Modular Rotary
Страница 15: ...15 Notes...
Страница 28: ...28 Notes...
Страница 33: ...33 VDI 6022 6...
Страница 34: ...34 1 x TE8x35 1 x 8 5 1 x M8 2 x TE8x35 2 x 8 5 2 x M8 7...
Страница 43: ...43 3 4 5 x 1 100mm 100mm 250mm 250mm 250mm 10 100mm 5mm...
Страница 44: ...44 6 7 NO OK...
Страница 45: ...45 H2O SOAP 8...
Страница 46: ...46 9...
Страница 47: ...47 Notes...
Страница 62: ...62 Repair log DATE SERVICE TYPE TIME REQUIRED SIGNATURE...