
3-5
3.3 Operation procedure
3.3.1 Operation procedure flow chart
S
S
S
I/O : Unit On / Off key
: S key
: Select key
: Enter key
: 8 / Chart key
CHART
CHART
CHART
CHART
CHART
M
MODE
M
MODE
M
MODE
I/O ON
Power off
Unit off
All Lighting
(for 3 sec.)
Preparation
(for 18 sec.)
Current
indication
※
1
No key operation for 30 sec.
Circuit Breaker ON
※
3 Battery mode
for 3 sec.
※
2 Operation Setting (Set Point ˚C, Humidity %, Defrost Internal)
※
6 Sensor
Indication
Chart Indication
(Refer to page3-53)
※
14 Downloading from controller
※
5 LED Display Light OFF.
(See note 1.)
※
7 Temperature
Record Scroll
※
8 Alarm
Record Scroll
※
9 PTI record
scrolling
or no key operation for 5 min.
To current indication with or if not controlled for 5 minutes
To current indication with or if not controlled for 5 minutes
※
4 G-Set operation
※
4 Automatic pump down
PTI
Refer to
page 3-46
Note 1.
※
5 activates when the "dISP" in
※
11 is set to "ON" in controller initial setting in page 3-22.
Refer to page 3-26.
I/O
for 3 sec.
Circuit Breaker OFF after setting change
(
OFF when no setting change
)
for 3 sec.
for 3 sec.
for 3 sec.
※
10
Optional
Function
Setting
※
11
Basic
Function
Setting
※
12
Optional
Condition
Setting
※
13
Input
Data
※
4 Mode Operation
03̲LXE10E100以降(1-12)̲E.qx 08.8.27 5:18 PM ページ 3-5
https://daikin-p.ru
Содержание LXE10E100
Страница 135: ...5 7 An example of installation of CA devices inside q TransFRESH ASS Y A4 A5 CABLES W MOUNTING BOX q https daikin p ru ...
Страница 170: ...7 12 Schematic wiring diagram LXE10E136 7 8 https daikin p ru ...
Страница 171: ...7 9 7 9 7 13 Stereoscopic wiring diagram LXE10E136 https daikin p ru ...