6-22
6.5.2 Short circuit operation of controller
SCC1-1 (Blue)
−
cooling operation
SCC3 (White)
−
the reverse phase
correction socket
SCC1-2 (Red)
−
heating operation
CN1 (Red)
CN-C1
CN-C1
CN8
CN-C2
CN-C2
Power OFF
Cooling operation
①
Turn OFF the circuit breaker.
Heating operation
Forcible
operation of
compressor
and condenser
fan
Confirmation of
power supply
reversed phase
⑥
In case of reversed phase, turn OFF the
circuit breaker and connect SCC3 (White)
from CN-C1 to CN-C2.
③
Connect SCC3 (White) to CN-C1.
②
Disconnect power supply connector CN1 (Red) located in front of the controller, and
disconnect short-circuit connectors SCC1-1 (Blue), SCC1-2 (Red) and SCC3 (White).
④
Connect short-circuit connector
SCC1-1 (Blue) to CN8 of the power
supply I/O board.
⑤
Turn ON the circuit breaker. If the
power supply is in reversed phase,
the compressor does not operate.
And the condenser fan is rotated
inversely.
⑤
Turn ON the circuit breaker. The evaporator
fan operates in reverse at reversed phase
and the fan runs at high speed. And fresh
air is taken in through the ventilator outlet
and discharged from the inlet.
④
Connect short-circuit connector
SCC1-2 (Red) to CN8 of the power
supply I/O board.
CN-C1
CN8
CN-C2
In case of
reversed phase
In case of
positive phase
Air suction
Air suction
Air discharge
Air discharge
06̲LXE10E100以降(1-26)̲E.qx 08.8.13 10:35 AM ページ 6-22
https://daikin-p.ru
Содержание LXE10E100
Страница 135: ...5 7 An example of installation of CA devices inside q TransFRESH ASS Y A4 A5 CABLES W MOUNTING BOX q https daikin p ru ...
Страница 170: ...7 12 Schematic wiring diagram LXE10E136 7 8 https daikin p ru ...
Страница 171: ...7 9 7 9 7 13 Stereoscopic wiring diagram LXE10E136 https daikin p ru ...