
Troubleshooting by Remote Controller
ESIE15-13B
158
Service Diagnosis
Troubleshooting
Note:
*1 Radiation fin temperature detection value
Model
Detection
Reset
RZQG71
91°C
81°C
RZQG100-140
68°C
58°C
Eliminate the cause.
Continue the operation.
YES
Caution
Be sure to turn off power switch before connect or disconnect connector, or parts damage may be occurred.
Turn the power ON, and then press
the remote controller check button
once.
NO
NO
Connect correctly.
NO
YES
Troubleshooting "
P4
".
YES
Replace the outdoor unit
inverter PCB.
YES
NO
Can it be considered
that the radiation fin temperature
was high? (
∗
1)
Is the connector
of the radiation fin thermistor
correctly connected to the
outdoor unit PCB?
(
∗
1)
"
P4
" is displayed?
Error is displayed again?
Содержание GQI-Eco Series
Страница 2: ......
Страница 6: ...ESIE15 13B iv Table of Contents...
Страница 14: ...Introduction ESIE15 13B xii...
Страница 18: ...Outlook Outdoor Units ESIE15 13B 4 General Information 2 Outlook Outdoor Units...
Страница 22: ...Operating range ESIE15 13B 8 General Information...
Страница 108: ...Emergency Operation ESIE15 13B 94 Field Setting...