2-5
Français
INSTALLATION DE L’UNITÉ INTÉRIEURE
SECTION
FLEXIBLE
PRISE
FAUX PLAFOND
SUPPORT DU
CONDUIT
CONDUIT
ÉLECTRIQUE
ADMISSION D’AIR
FIBRE DE VERRE
COUVERTE D’ALUMINIUM
RET
OUR DE L
’EAU
RÉFRIGÉRÉE
CONDENSATION DES
ÉCOULEMENTS
ISOLATION PART
TUYAUX C/W
RACCORD
FLEXIBLE
FEUILLE
MÉTALLIQUE
TASSEAU
ISOLANT
RESSORT
ISOLANT
TIGE FILETÉE
RET
OUR
ESP
ACE LIBRE
PLAFOND
ARRIVÉE DE L
’EAU
RÉFRIGÉRÉE
2 IM-SBBW-0314(1)DAIKIN-FR.indd 5
2 IM-SBBW-0314(1)DAIKIN-FR.indd 5
1/9/15 9:42:51 AM
1/9/15 9:42:51 AM
Содержание FUD20B
Страница 14: ...MEMO 1 IM SBBW 0314 1 DAIKIN EN indd 12 1 IM SBBW 0314 1 DAIKIN EN indd 12 1 9 15 9 38 55 AM 1 9 15 9 38 55 AM...
Страница 74: ...M TKA 6 IM SBBW 0314 1 DAIKIN RU indd 12 6 IM SBBW 0314 1 DAIKIN RU indd 12 1 9 15 9 44 32 AM 1 9 15 9 44 32 AM...
Страница 86: ...NOT 7 IM SBBW 0314 1 DAIKIN TR indd 12 7 IM SBBW 0314 1 DAIKIN TR indd 12 1 9 15 9 44 49 AM 1 9 15 9 44 49 AM...
Страница 87: ...CVR IM SBBW 0314 2 DAIKIN EN 4013 3 CVR IM SBBW 0314 2 DAIKIN EN 4013 3 3 24 16 9 17 14 AM 3 24 16 9 17 14 AM...
Страница 88: ...CVR IM SBBW 0314 2 DAIKIN EN 4014 4 CVR IM SBBW 0314 2 DAIKIN EN 4014 4 3 24 16 9 17 15 AM 3 24 16 9 17 15 AM...
Страница 91: ...0 IM SBBW 0314 0 DAIKIN AR indd 12 0 IM SBBW 0314 0 DAIKIN AR indd 12 1 9 15 9 42 12 AM 1 9 15 9 42 12 AM...
Страница 98: ...0 IM SBBW 0314 0 DAIKIN AR indd 5 0 IM SBBW 0314 0 DAIKIN AR indd 5 1 9 15 9 42 15 AM 1 9 15 9 42 15 AM...
Страница 103: ...CVR IM SBBW 0314 2 DAIKIN AR 4012 2 CVR IM SBBW 0314 2 DAIKIN AR 4012 2 3 24 16 9 16 53 AM 3 24 16 9 16 53 AM...