
Outdoor Unit / RK(X)H-C, ARK(X)H-C, R(Y)N-C
SiENBE04-512A
206
Removal Procedure
5. Remove the sound
insulation pad.
Preparation
Remove the partition plate
according to the removal of
partition plate.
1
Untie the fixing strap of
the sound insulation
pad (outer shell).
The slits of the sound
insulation pad for piping are
apt to break off. Pay
attention when removing.
2
Pull out the sound
insulation pad (outer
shell).
Step
Procedure
Points
S
o
u
nd in
su
l
a
tion
p
a
d (o
u
ter
s
hell)
(R4495)
SiENBE04-512A.book Page 206 Friday, October 5, 2007 1:49 PM
Содержание FTKS20CVMB(9)
Страница 1: ...SiENBE04 512A Service Manual Inverter Pair Wall Mounted Type C Series D Series...
Страница 17: ...List of Functions SiENBE04 512A 8 List of Functions...
Страница 18: ...SiENBE04 512A Specifications 9 Part 2 Specifications 1 Specifications 10 1 1 Cooling Only 10 1 2 Heat Pump 16...
Страница 37: ...Specifications SiENBE04 512A 28 Specifications...
Страница 73: ...Control Specification SiENBE04 512A 64 Function and Control...
Страница 103: ...Instruction SiENBE04 512A 94 System Configuration...
Страница 147: ...Check SiENBE04 512A 138 Service Diagnosis...
Страница 225: ...Outdoor Unit RK X H C ARK X H C R Y N C SiENBE04 512A 216 Removal Procedure...
Страница 226: ...SiENBE04 512A Others 217 Part 8 Others 1 Others 218 1 1 Test Run from the Remote Control 218 1 2 Jumper Settings 219...
Страница 229: ...Others SiENBE04 512A 220 Others...
Страница 241: ...Wiring Diagrams SiENBE04 512A 232 Appendix...
Страница 245: ...SiENBE04 512A iv Index wiring diagrams 229...