SiENBE04-512A
Check
Service Diagnosis
137
5.1.11 Hall IC Check
Check No.16
1. Check the connector connection.
2. With the power ON, operation OFF, and the connector connected, check the following.
∗
Output voltage of about 5 V between pins 1 and 3.
∗
Generation of 3 pulses between pins 2 and 3 when the fan motor is operating.
Failure of (1)
Æ
faulty PCB
Æ
Replace the PCB.
Failure of (2)
Æ
faulty Hall IC
Æ
Replace the fan motor.
Both (1) and (2) result
Æ
Replace the PCB.
Gr
a
y (power
su
pply)
P
u
rple (
s
ign
a
l
s
)
Bl
u
e (gro
u
nding)
1
2
3
(R196
8
)
SiENBE04-512A.book Page 137 Friday, October 5, 2007 1:49 PM
Содержание FTKS20CVMB(9)
Страница 1: ...SiENBE04 512A Service Manual Inverter Pair Wall Mounted Type C Series D Series...
Страница 17: ...List of Functions SiENBE04 512A 8 List of Functions...
Страница 18: ...SiENBE04 512A Specifications 9 Part 2 Specifications 1 Specifications 10 1 1 Cooling Only 10 1 2 Heat Pump 16...
Страница 37: ...Specifications SiENBE04 512A 28 Specifications...
Страница 73: ...Control Specification SiENBE04 512A 64 Function and Control...
Страница 103: ...Instruction SiENBE04 512A 94 System Configuration...
Страница 147: ...Check SiENBE04 512A 138 Service Diagnosis...
Страница 225: ...Outdoor Unit RK X H C ARK X H C R Y N C SiENBE04 512A 216 Removal Procedure...
Страница 226: ...SiENBE04 512A Others 217 Part 8 Others 1 Others 218 1 1 Test Run from the Remote Control 218 1 2 Jumper Settings 219...
Страница 229: ...Others SiENBE04 512A 220 Others...
Страница 241: ...Wiring Diagrams SiENBE04 512A 232 Appendix...
Страница 245: ...SiENBE04 512A iv Index wiring diagrams 229...