
SiENBE04-512A
Outdoor Unit / ARK(X)S-C
Removal Procedure
179
2.7
Removal of PCB
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the PCB.
You can remove the PCB
when you disconnect the
read wires on the terminal
board without removing the
electrical box.
PbF (Pb free brazing) is
adopted.
1
Feature of the PCB
2
Loosen the screw on
the terminal board.
3
Release the earth
terminal.
SiENBE04-512A.book Page 179 Friday, October 5, 2007 1:49 PM
Содержание FTKS20CVMB(9)
Страница 1: ...SiENBE04 512A Service Manual Inverter Pair Wall Mounted Type C Series D Series...
Страница 17: ...List of Functions SiENBE04 512A 8 List of Functions...
Страница 18: ...SiENBE04 512A Specifications 9 Part 2 Specifications 1 Specifications 10 1 1 Cooling Only 10 1 2 Heat Pump 16...
Страница 37: ...Specifications SiENBE04 512A 28 Specifications...
Страница 73: ...Control Specification SiENBE04 512A 64 Function and Control...
Страница 103: ...Instruction SiENBE04 512A 94 System Configuration...
Страница 147: ...Check SiENBE04 512A 138 Service Diagnosis...
Страница 225: ...Outdoor Unit RK X H C ARK X H C R Y N C SiENBE04 512A 216 Removal Procedure...
Страница 226: ...SiENBE04 512A Others 217 Part 8 Others 1 Others 218 1 1 Test Run from the Remote Control 218 1 2 Jumper Settings 219...
Страница 229: ...Others SiENBE04 512A 220 Others...
Страница 241: ...Wiring Diagrams SiENBE04 512A 232 Appendix...
Страница 245: ...SiENBE04 512A iv Index wiring diagrams 229...