Correcting after abnormal completion of the test operation

The test operation is only completed if there is no malfunction code
displayed on the remote controller. In case of a displayed malfunction
code, perform the following actions to correct the abnormality:

Confirm the malfunction code on the remote controller

After correcting the abnormality, press the 

BS3 RETURN

 button

and reset the malfunction code.

Carry out the test operation again and confirm that the
abnormality is properly corrected.

Refer to the installation manual of the indoor unit for other
detailed codes.

15. O

PERATION

 

OF

 

THE

 

UNIT

Once the unit is installed and test operation of outdoor unit and
indoor units is finished, the operation of the unit can start.

For operating the indoor unit, the remote controller of the indoor unit
should be switched ON. Refer to the indoor unit operation manual for
more details.

16. M

AINTENANCE

 

AND

 

SERVICE

16.1. Maintenance introduction

In order to ensure optimal operation of the unit, a number of checks
and inspections should be carried out on the unit at regular intervals,
preferably yearly. 

This maintenance shall be carried out by the installer or service
agent.

16.2. Service precautions

Installation error

Error code

Remedial action

The stop valve of an 
outdoor unit is left 
closed.

E3

E4

F3

F6

UF

Open the stop valve.

The phases of the 
power to the outdoor 
unit is reversed.

U1

Exchange two of the three phases 
(L1, L2, L3) to make a positive 
phase connection.

No power is supplied 
to an outdoor or 
indoor unit (including 
phase interruption).

LC

U1

U4

Check if the power wiring for the 
outdoor unit is connected correctly.

Incorrect 
interconnections 
between units.

UF

Check if the refrigerant piping and 
the unit wiring are consistent with 
each other.

Refrigerant 
overcharge.

E3

F6

UF

Recalculate the required amount of 
refrigerant from the piping length 
and correct the refrigerant charge 
level by recovering any excessive 
refrigerant with a refrigerant 
recovery machine.

Insufficient refrigerant.

E4

F3

Check if the additional refrigerant 
charge has been finished correctly.
Recalculate the required amount of 
refrigerant from the piping length 
and add an adequate amount of 
refrigerant.

In case the test 
operation was 
interrupted or the unit 
was operating out of 
the instructed 
temperature range, 
the initial refrigerant 
detection has failed.

U3

In case the the test operation was 
interrupted, perform the test 
operation again.
Perform the test operation again 
within the instructed temperature 
range. 
Test run is possible for ambient 
temperatures between –20°C and 
35°C.

DANGER: ELECTRICAL SHOCK

See 

"2. General Safety precautions" on page 2

.

CAUTION

when performing service to inverter equipment

1

Do not open the electric component box cover for 10
minutes after the power supply is turned off.

2

Measure the voltage between terminals on the
terminal block for power supply with a tester and
confirm that the power supply is shut off.

In addition, measure the points, as shown in the figure
below, with a tester and confirm that the voltage of the
capacitor in the main circuit is less than 50 V DC.

3

To prevent damaging the PC-board, touch a non-
coated metal part to eliminate static electricity before
pulling out or plugging in connectors.

4

Pull out junction connectors X1A, X2A, X3A, X4A
(X3A and X4A of 16 are inside the electric
component box (2), refer to the wiring diagram) for the
fan motors in the outdoor unit before starting service
operation on the inverter equipment. Be careful not to
touch the live parts.

(If a fan rotates due to strong wind, it may store
electricity in the capacitor or in the main circuit and
cause electric shock.)

5

After the service is finished, plug the junction
connecter back in. Otherwise the error code 

E7

 will be

displayed on the remote controller and normal
operation will not be performed.

For details refer to the wiring diagram labelled on the back
of the electric component box cover.

Pay attention to the fan.

 It is dangerous to inspect the

unit while the fan is running. Be sure to turn off the main
switch and to remove the fuses from the control circuit
located in the outdoor unit.

NOTE

Play it safe!

For protection of the PCB, touch the switch box casing
by hand in order to eliminate static electricity from your
body before performing service.

A2P

A2P

A1P

A3P

TP1 TP2

4PEN501819-1.book  Page 28  Wednesday, September 13, 2017  12:52 PM

Содержание EMRQ8ABY1

Страница 1: ...INSTALLATION MANUAL EMRQ8ABY1 EMRQ10ABY1 EMRQ12ABY1 EMRQ14ABY1 EMRQ16ABY1 Daikin Altherma outdoor unit 4PEN501819 1 book Page 1 Wednesday September 13 2017 12 52 PM...

Страница 2: ...vlastn zodpovednos e zariadenie na ktor sa vz ahuje toto vyhl senie 25 w tamamen kendi sorumlulu unda olmak zere bu bildirinin ilgili oldu u donan m n n a a daki gibi oldu unu beyan eder 01 as set ou...

Страница 3: ...aksim l pie aujam temperat ra TS TSmin Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces ies...

Страница 4: ...uming after electrical installation is done on any indoor or outdoor unit 17 General guidelines 16 Set up 17 Leak test 18 Vacuum drying 18 11 Pipe insulation 18 12 Electrical wiring work 19 12 1 Preca...

Страница 5: ...on Improper installation or attachment of equipment or accessories could result in electric shock short circuit leaks fire or other damage to the equipment Be sure only to use accessories and optional...

Страница 6: ...ing accessories are supplied with the unit 1 EKHBRD connection is possible for EKHBRD_ABX and EKHBRD_AC Connection is NOT possible for EKHBRD_AA or EKHBRD_AB models For more details see technical data...

Страница 7: ...ectrical component box cover as follows For service purposes the push buttons on the switch box PCB need to be accessed To access these push buttons the electrical component box cover does not need to...

Страница 8: ...16 9 Electronic expansion valve subcooling Y2E Y5E 3 Heat exchanger 10 Electronic expansion valve charge Y4E 4 Fan 11 4 way valve heat exchanger Y2S Y9S 5 Fan motor M1F M2F 12 4 way valve pipe Y8S 6...

Страница 9: ...field wiring with cable ties to the switch box to ensure strain relief 4 Magnetic contactor K2M 5 Current sensor PCB 2 1 4 5 2 3 3 3 3 3 3 3 3 1 1 Main PCB 2 Sub 1 PCB 3 Terminal block X1M Main termi...

Страница 10: ...to leak Locations where a mineral oil mist spray or vapour may be present in the atmosphere Plastic parts may deteriorate and fall off or cause water leakage Locations where equipment that produces el...

Страница 11: ...and snow install a baffle plate on the air side of the outdoor unit In heavy snowfall areas it is very important to select an installation site where the snow will not affect the unit If lateral snow...

Страница 12: ...nit take into account the following 1 Fragile handle the unit with care Keep the unit upright in order to avoid compressor damage 2 Choose on beforehand the path along which the unit is to be brought...

Страница 13: ...m above the foundation surface CAUTION To avoid injury do not touch the air inlet or aluminium fins of the unit WARNING Tear apart and throw away plastic packaging bags so that children will not play...

Страница 14: ...case the required pipe sizes inch sizes are not available it is also allowed to use other diameters mm sizes taken the following into account select the pipe size nearest to the required size use the...

Страница 15: ...net header to indoor unit 40 m Example 1 unit 5 b c d e 40 m Example 2 unit 3 b e 40 m unit 5 f h 40 m Example 3 unit 5 f 40 m Maximum allowable height difference Difference in height between outdoor...

Страница 16: ...An oxidized film adversely affects valves and compressors in the refrigerating system and prevents proper operation The nitrogen pressure should be set to 0 02 MPa i e just enough so it can be felt o...

Страница 17: ...event rusting When passing electrical wiring through the knock out holes wrap the wiring with protective tape to prevent damage as shown above 3x 1 2 3 NOTE Any gas or oil remaining inside the stop va...

Страница 18: ...are the responsibility of the installer field piping 1 Pinched piping 2 Stop valve 3 Service port 4 Point of melting the brazing metal cut pipe off just above this brazing or marking point Never remov...

Страница 19: ...valve After handling the service port make sure to tighten the service port cover securely For the tightening torque refer to the table below Check for refrigerant leaks after tightening the service...

Страница 20: ...being present in the refrigerant piping for example rainwater may have entered the piping first carry out the vacuum drying procedure below until all moisture has been removed and consider the install...

Страница 21: ...branch kits entirely Be sure to insulate liquid and discharge piping for all units Use heat resistant polyethylene foam which can withstand a temperature of 70 C for liquid piping and polyethylene fo...

Страница 22: ...t operation If there exists the possibility of reversed phase after a momentary black out and the power goes on and off while the product is operating attach a reversed phase protection circuit locall...

Страница 23: ...tem overview of field wiring Field wiring consists out of power supply always including earth and indoor outdoor communication transmission wiring 12 4 Requirements The power supply must be protected...

Страница 24: ...sion wiring Care should be taken for connecting the wires to the terminal block 1 Power supply inside a conduit 2 Conduit 3 Power supply 4 Cut off the shaded zones before usage 5 Through hole cover 1...

Страница 25: ...en connecting the power supply the earth connection must be made before the current carrying connections are established When disconnecting the power supply the current carrying connections must be se...

Страница 26: ...nhouse gases label peal off the applicable language and stick it on top of 1 2 Factory refrigerant charge see unit name plate 3 Additional refrigerant amount charged 4 Total refrigerant charge 5 Green...

Страница 27: ...further explanation on how to do the necessary settings 6 Push the BS1 MODE button for 5 sec the H1P LED is on w 7 Push the BS2 SET button 20 times until following LED combination is reached 8 Push th...

Страница 28: ...liquid and discharge side The suction stop valve should remain closed at all times 10 Damaged equipment Check the inside of the unit on damaged components or squeezed pipes 11 Refrigerant leak Check...

Страница 29: ...shing the BS3 RETURN button defines the setting Finally when pushing the BS3 RETURN button again the operation starts according to the setting Pushing BS1 MODE button will get you back to the initial...

Страница 30: ...ralized control will display on the remote controller It may take 10 minutes to bring the state of the refrigerant uniform before the compressor starts During the test operation the refrigerant runnin...

Страница 31: ...ge has been finished correctly Recalculate the required amount of refrigerant from the piping length and add an adequate amount of refrigerant In case the test operation was interrupted or the unit wa...

Страница 32: ...7 1 Introduction The installer and system specialist shall secure safety against leakage according to local regulations or standards The following standards may be applicable if local regulations are...

Страница 33: ...t of the refrigerant of oil and of other parts must be done in accordance with relevant local and national legislation 19 UNIT SPECIFICATIONS Technical specifications Electrical specifications amount...

Страница 34: ...4PEN501819 1 book Page 1 Wednesday September 13 2017 12 52 PM...

Страница 35: ...4PEN501819 1 book Page 2 Wednesday September 13 2017 12 52 PM...

Страница 36: ...4P501819 1 2017 08 Copyright 2017 Daikin 4P501819 1 0000000M 4PEN501819 1 book Page 1 Wednesday September 13 2017 12 52 PM...

Отзывы: