Forklift
For more safety during transport by forklift, it is recommended ditching the panel to the forklift.
Crane or Bridge Crane
Fig. 14 - Angle to respect for lifting operation
For handling by crane or bridge cranes, before lifting the panel it is necessary to verify the following conditions:
•
excellent condition of the ropes or chains;
•
the angle between the lifting cables and the panel roof must be ≥ 45°;
•
maximum lifting weight must be respected;
14.7 MECHANICAL INSTALLATION
14.7.1 Shipping
The stability and the absence of any kind of deformation of the unit during shipping must be ensured. If the machine is
shipped with a wooden cross-plank on its base, this cross-plank must only be removed after the final destination has been
reached.
14.7.2 Cabinet Handling and Lifting
Avoid bumping and/or jolting during unloading from the lorry and moving the machine. Do not push or pull the machine
from any part other than the base frame. Block the machine from sliding inside the lorry in order to prevent damage to the