RECEIVING THE UNIT
The unit should be inspected immediately after receipt for possible damage.
All Daikin centrifugal water chillers are shipped FOB factory and all claims for handling and shipping damage are the
responsibility of the consignee.
Insulation corners from the evaporator
’s rigging hole locations are shipped loose and should be glued in place after the
unit is finally placed. Neoprene vibration pads are also shipped loose. Check that these items have been delivered with
the unit.
If so equipped, leave the shipping skid in place until the unit is in its final position. This will aid in handling the equipment.
Extreme care must be used when rigging the equipment to prevent damage to the control panels or refrigerant piping. See
the certified dimension drawings included in the job submittal for the center of gravity of the unit. Consult the local Daikin
sales office for assistance if the drawings are not available.
The unit can be lifted by fastening the rigging hooks to the four corners of the unit where the rigging eyes are located (see
Figure below). Spreader bars must be used between the rigging lines to prevent damage to the control panels, piping and
motor terminal boxes.
Fig. 5 - DWSC Major Component Locations
Chilled water and condenser connection location can vary. Check markings on unit or consult unit
certified drawings for connection locations on specific units
VFD panel + Unit
control panel +
Auxliaries
Operator
interface panel
Rigging
locations (6)
available
Rigging
locations (6)
available
Evaporator
Condenser