left discharge and counterflow furnaces with right air
discharge. This configuration allows the flue and combustion
air piping to be run vertically through the side of the furnace.
Refer to the “Recommended Installation Positions” figure for
further detail. The standard piping connections may also be
used in these positions. Refer to
Vent/Flue Pipe and
Combustion Air Pipe
for details concerning the conversion to
the alternate vent/flue and combustion air connections.
When using the horizontal alternate vent configuration, you
must use the RF000142 vent drain kit. See following
illustration.
Alternate Vent/Flue Location
Figure 3A
Figure 3B
Figure 3C
Recommended Installation Positions
A
LTERNATE
E
LECTRICAL
AND
G
AS
L
INE
C
ONNECTIONS
This furnace has provisions allowing for electrical and gas lin
connections through either side panel. In horizontal
applications the connections can be made either through the
“top” or “bottom” of the furnace.
D
RAIN
P
AN
A drain pan must be provided if the furnace is installed above
a conditioned area. The drain pan must cover the entire
area under the furnace (and air conditioning coil if
applicable).
F
REEZE
P
ROTECTION
Refer to
Horizontal Applications and Conditions - Drain Trap
and Lines.
WARNING
P
OSSIBLE
PROPERTY
DAMAGE
,
PERSONAL
INJURY
OR
DEATH
MAY
OCCUR
IF
THE
CORRECT
CONVERSION
KITS
ARE
NOT
INSTALLED
. T
HE
APPROPRIATE
KITS
MUST
BE
APPLIED
TO
ENSURE
SAFE
AND
PROPER
FURNACE
OPERATION
. A
LL
CONVERSIONS
MUST
BE
PERFORMED
BY
A
QUALIFIED
INSTALLER
OR
SERVICE
AGENCY
.
High
Stage
Low
Stage
Natural
None
# 45
3.5" w.c.
1.9" w.c.
None
P ropane
LP M -08*
1
1.25mm
10.0" w.c.
6.0" w.c.
None
Gas
A ltitude
Kit
Orifice
M anifold P ressure
P ressure
Switch
Change
0-7000
1
LP M -08* supports both Honeywell and White-Ro dgers 2-stage valves
N O T E:
In Canada, gas furnaces are only certified to 4500 feet.
P
ROPANE
G
AS
/H
IGH
A
LTITUDE
I
NSTALLATIONS
This furnace is shipped from the factory configured for natural
gas at tandard altitude. Propane gas installations require an
orifice change to compensate for the energy content
difference between natural and propane gas.
For furnaces being converted to LP gas, it is strongly
recommended that a LPLP03 kit also be installed. The use
of this kit will prevent the furnace from firing when the LP
gas supply pressure is too low to support proper combustion.
High altitude installations may require both a pressure switch
and an orifice/spring change. These changes are necessary
to compensate for the natural reduction in the density of
both the gas fuel and the combustion air at higher altitude.
For installations above 7000 feet, please refer to the furnace
Specification Sheets for required kit(s).
F
AILURE
TO
FOLLOW
THESE
INSTRUCTIONS
CAN
RESULT
IN
BODILY
INJURY
OR
DEATH
. C
AREFULLY
READ
AND
FOLLOW
ALL
INSTRUCTIONS
GIVEN
IN
THIS
SECTION
.
WARNING
U
PON
COMPLETION
OF
THE
FURNACE
INSTALLATION
,
CAREFULLY
INSPECT
THE
ENTIRE
FLUE
SYSTEM
BOTH
INSIDE
AND
OUTSIDE
OF
THE
FURNACE
TO
ASSURE
IT
IS
PROPERLY
SEALED
. L
EAKS
IN
THE
FLUE
SYSTEM
CAN
RESULT
IN
SERIOUS
PERSONAL
INJURY
OR
DEATH
DUE
TO
EXPOSURE
TO
FLUE
PRODUCTS
,
INCLUDING
CARBON
MONOXIDE
.
WARNING
Contact the distributor for a tabular listing of appropriate
manufacturer’s kits for propane gas and/or high altitude
installations. The indicated kits must be used to insure safe
and proper furnace operation. All conversions must be