background image

4 Installation

Installation manual

12

D2C20ND0 D2C24ND035A5AA

Wall-mounted condensing boiler

3P469346-10J – 2018.05

4.8.2

Guidelines when connecting the gas
piping

This  unit  is  designed  to  be  operated  with  natural  gas  or  LPG.  The
preset gas type and the designated gas inlet pressure are indicated
on the boiler's identification label.

WARNING

Only  qualified  persons  are  allowed  to  connect  the  gas
piping.  The  gas  inlet  pipe  diameter  must  be  selected
according  to  the  applicable  legislation,  standards,  and
regulations.

Connect  the  gas  piping  according  to  applicable  legislation  of  the
country  of  destination  and  the  regulations  of  the  gas  supply
company.

Connect  the  gas  supply  piping  without  tension  to  the  gas  pipe
connection  ("Connection  F",  see 

"4.8.1  Piping  connections"  on

page 11

).

WARNING

After  the  gas  connection  is  made,  the  gas  line  must  be
tested  for  leakage  while  the  gas  line  to  the  boiler  is  open
(see 

"5.3 To check for gas leakage" on page 24

).

In case gas piping is adjacent to the wall and is to be connected to
the  gas  pipe  connection  of  the  boiler  with  an  elbow,  enough  space
for taking out the condensate trap must be left. This can be done in
two ways:

1

Elbow  must  be  placed  crosswise  so  it  will  not  block  the
condensate trap when it is being taken out.

2

Elbow must be placed 200 mm below the gas piping connection
of the boiler.

4.8.3

Guidelines when connecting the water
piping

When  connecting  the  piping  to  the  boiler,  observe  the  following
instructions:

WARNING

Ignoring  the  rules  explained  below  may  result  in  serious
damages in installation or boiler or cause discomfort of the
user. The manufacturer is not responsible for any damage
that may occur this way.

▪ The  installation  of  the  boiler  should  be  in  compliance  with  the

applicable legislation, standards, and regulations.

▪ The materials used in the installation must be in compliance with

the applicable legislation, standards, and regulations.

▪ Heating installation piping material must not allow oxygen diffusion

according to DIN4726.

▪ The  central  heating/domestic  hot  water  installation  should  be

flushed  and  visually  inspected.  Wastes,  dust,  rubbers,  and  metal
pieces generated during the installation and mounting of the boiler
must be removed in order not to cause any damage.

▪ The central heating circuit must be able to withstand a pressure of

at least 6 bar.

▪ Cross  connection  must  be  preferred  in  the  radiators  longer  than

1.5 metres.

▪ The safety valve piping should be connected to a water outlet with

an additional hose or piping. This outlet should not be installed in
places  where  there  is  risk  of  freezing,  nor  in  the  rain  gutter,  it
should  not  end  to  dry  floor  without  available  drainage  to  avoid
damaging of floor coating like parquet.

▪ The maximum pressure in the domestic hot water circuit is 10 bar.

Inspect  the  piping  taking  this  in  to  consideration.  If  the  water
pressure  of  the  main  water  supply  is  excessive,  use  an
appropriate  pressure  reducer.  Installation  must  comply  with
EN 15502-2-2.

▪ As  the  condensing  boilers  generate  condensate,  the  condensate

trap  outlet  should  be  connected  to  an  open  drain.  Piping  and
elements of the drain line must be made of acid-resistant material
like plastics. Metals like steel or copper are not allowed.

▪ The  system  must  be  air-free  to  protect  the  boiler.  There  are  two

automatic air vents on the boiler, one at heat exchanger, the other
on  the  pump.  Ensure  air  is  discharged  completely  at  each  water
filling. Bleed the radiators if necessary.

▪ If  the  boiler  will  be  connected  to  an  old  central  heating/domestic

hot water installation, then first visually inspect the old installation.
The  installation  must  be  in  compliance  with  the  capacity  of  the
boiler  and  must  not  prevent  the  efficient  running  of  it.  Dirt  in  old
system and piping must be flushed, and filters must be inspected.

▪ If old piping material does not have oxygen barrier, then it must be

separated from the boiler circuit via a plate heat exchanger and a
second pump has to be installed for necessary circulation.

▪ If  the  pressure  reading  on  the  boiler  user  interface  is  dropping

repeatedly,  most  probably  there  is  a  leakage  in  the  installation.
Inspect the installation to repair.

▪ In case of solar preheating of the domestic hot water from a solar

tank,  install  the  thermostatic  mixing  valve  at  the  domestic  hot
water outlet and inlet.

4.8.4

Guidelines when connecting the electrical
wiring

DANGER

Before  working  on  the  electrical  circuit  always  isolate  the
unit from the power mains.

WARNING

Only  qualified  persons  are  allowed  to  make  electrical
connections on the unit. Failure to observe this warning will
void the warranty. The manufacturer is not responsible for
any damage that may occur this way.

WARNING

Use  a  dedicated  power  circuit.  Never  use  a  power  supply
cable shared by another unit.

The unit runs on 230 V AC 50 Hz power. A power cable is delivered
with the package. The power cable must be connected to the power
supply  by  an  electrician  and  in  accordance  with  the  applicable
legislation.

Содержание D2C20ND028A5AA

Страница 1: ...Installation manual Wall mounted condensing boiler English Manuel d installation Chaudi re murale condensation Fran ais Installation manual Wall mounted condensing boiler D2C20ND028A5AA D2C24ND035A5AA...

Страница 2: ...tiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodytus standartus ir arba kitus norminius dokumentus su s lyga kad yra naudojami pagal m s nurodymus tad ja lie...

Страница 3: ...commission the domestic hot water 25 6 Hand over to the user 25 Disposal Old units must be appropriately disposed of in accordance with local and national regulations The components are easy to separa...

Страница 4: ...ualified person shall explain the operating principles and the use of the unit to the user The user is not allowed to perform any modifications maintenance or repairs on the unit unless otherwise stat...

Страница 5: ...llation Automatic air vents There are two air vents one on the pump other on the heat exchanger They help discharging the air inside the installation and heating circuit to avoid air traps and consequ...

Страница 6: ...vessel 10 litres d Gas valve e Heat exchanger f 3 way valve stepper motor g Domestic hot water temperature sensor h Plate heat exchanger i Safety valve 3 bar j Condensate trap k Ignition transformer...

Страница 7: ...min max m h 0 51 2 04 0 51 2 45 Natural Gas G25 Consumption min max m h 0 59 2 35 0 59 2 85 LPG G31 Consumption min max m h 0 2 0 98 0 2 1 19 Combustion products mass flow rate min max G20 g s 2 2 12...

Страница 8: ...60 C return temperature at heater inlet and 80 C flow temperature at heater outlet b Low temperature means for condensing boilers 30 C for low temperature boilers 37 C and for other heaters 50 C retur...

Страница 9: ...room or compartment it does not require a dedicated ventilation for combustion air If however installed in a room containing a bath or a shower then particular reference is drawn to the current I E E...

Страница 10: ...3 m 1 5 bar h h System water height m p System charge pressure bar According to the graph below there is no need to install an additional expansion vessel for the systems with a water volume in the ar...

Страница 11: ...central heating circuit 0 0 100 200 300 400 500 600 700 800 200 400 600 800 1000 1200 1400 1600 1800 A mbar B l h A Residual pump lift mbar B Flow l h 4 8 Connections NOTICE During installation do no...

Страница 12: ...onger than 1 5 metres The safety valve piping should be connected to a water outlet with an additional hose or piping This outlet should not be installed in places where there is risk of freezing nor...

Страница 13: ...b a L N a b WARNING Do not interchange the supply conductors L and the neutral conductor N DANGER Do not use gas and water pipes for earthing purposes and ensure that they have not been used for this...

Страница 14: ...C20ND028A5AA D2C24ND035A5AA Wall mounted condensing boiler 3P469346 10J 2018 05 4 8 6 Wiring diagram DANGER RISK OF ELECTROCUTION Disconnect the power supply for more than 10 minutes before servicing...

Страница 15: ...temperature sensor Ext1 X8 BCC Boiler Chip Card Ext2 X10 Personal computer production interface Ext3 X1M Daikin room thermostat Ext4 X2M External power output 230 V AC Ext5 X2M Reserved not in use X1...

Страница 16: ...The boiler must be installed so that the terminal is exposed to external air Position of the terminal must allow the free passage of air across it at all times Pluming may occur at the flue terminal P...

Страница 17: ...flue length value Flue length determination Flue duct length L is measured from lip of the elbow to end of the flue terminal L a L Flue duct length a Distance of outer lip of terminal to outer wall a...

Страница 18: ...e flex boiler connection set 100 or 130 b Extension 60 mm c Chimney connection 60 100 d Elbow 60 100 90 Optional e 90 elbow 60 100 f 45 elbow 60 100 g Inspection elbow 60 100 h 30 elbow 60 100 i Exten...

Страница 19: ...45 elbow 80 mm 1 0 m 90 elbow 80 mm 2 0 m Subtract equivalent length value of bends from the allowable flue length value Note The air intake length is 3 metres In case of longer air intake use flue o...

Страница 20: ...ular and rough 140 18 2 53 5 Allowable flue length for C93x DN 80 Flex circular and rough 130 11 6 34 1 DN 80 Flex circular and rough 120 4 4 13 0 DN 80 Flex square and rough 140 23 8 69 9 DN 80 Flex...

Страница 21: ...FGP4661 45 elbow 80 125 EKFGP4811 30 elbow 60 100 EKFGP4664 30 elbow 80 125 EKFGP4814 Extension duct 60 100 500 mm EKFGP4651 1000 mm EKFGP4652 Extension duct 80 125 500 mm EKFGP4801 1000 mm EKFGP4802...

Страница 22: ...t the update process When the app finalizes the update the next screen with the current firmware version appears It will take some time before the adapter finalized the firmware update reboot process...

Страница 23: ...e opened Vent the air from the installation with the manual air vent screws on the radiators Make sure screws are tightened after venting 9 If after the venting the pressure decreases below 0 8 bar re...

Страница 24: ...outlet 5 2 Gas air ratio No need to adjust The installer does not have to adjust the gas air ratio because the boiler has an electronic gas adaptive feature 5 3 To check for gas leakage DANGER Before...

Страница 25: ...weeper mode again press Cancel and Menu buttons together five seconds Sweeper mode will be deactivated and boiler will return to normal operation mode Sweeper mode also finishes automatically after 15...

Страница 26: ...e en service de l eau chaude sanitaire 49 6 Remise l utilisateur 49 Mise au rebut Les anciennes unit s doivent tre mises au rebut correctement conform ment aux r glements locaux et nationaux Les compo...

Страница 27: ...r L utilisateur n est pas autoris effectuer une quelconque modification maintenance ou r paration de l unit sauf mention contraire ou demander des tiers non agr s d effectuer de telles actions Sinon l...

Страница 28: ...Purgeurs d air automatiques Il y a deux purgeurs d air un sur la pompe et un autre sur l changeur de chaleur Ils aident d charger l air l int rieur de l installation et du circuit de chauffage afin d...

Страница 29: ...r pas pas de vanne 3 voies g Capteur de temp rature d eau chaude sanitaire h changeur de chaleur plaques i Vanne de s curit 3 bar j Purgeur de condensat k Transformateur d allumage l Capteur de temp r...

Страница 30: ...in max m h 0 51 2 04 0 51 2 45 Consommation de gaz naturel G25 min max m h 0 59 2 35 0 59 2 85 Consommation de GPL G31 min max m h 0 2 0 98 0 2 1 19 D bit de masse de produits de combustion min max G2...

Страница 31: ...de retour de 60 C l entr e du chauffage et une temp rature du d part de 80 C la sortie du chauffage b Une temp rature faible signifie 30 C pour les chaudi res condensation 37 C pour les chaudi res bas...

Страница 32: ...la mesure applicable Reportez vous la section Espacements d installation minimaux la page 32 Si la chaudi re est install e dans une pi ce ou un compartiment une a ration s par e pour l air comburant n...

Страница 33: ...rature de l eau qui circule dans le circuit La d termination de la hauteur d eau du syst me et de la pression de charge du syst me concern e est indiqu e ci dessous h p 6 m 0 8 bar 7 m 0 9 bar 8 m 1 0...

Страница 34: ...Graphique de rel vement de pompe r siduel Le graphique de rel vement de pompe r siduel montre la quantit de rel vement de pompe mbar qui reste pour le circuit de chauffage central 0 0 100 200 300 400...

Страница 35: ...ges Le circuit de chauffage central doit tre capable de r sister une pression d au moins 6 bar Le branchement crois doit tre privil gi dans les radiateurs d une longueur sup rieure 1 5 m tre La tuyaut...

Страница 36: ...idement Le c ble d alimentation lectrique doit tre au minimum quivalent H05RN F 2451EC57 Conformez vous au point ci dessous lors du c blage au bloc de bornes d alimentation b a L N a b AVERTISSEMENT N...

Страница 37: ...2C24ND035A5AA Chaudi re murale condensation 3P469346 10J 2018 05 4 8 6 Sch ma de c blage DANGER RISQUE D LECTROCUTION D branchez l alimentation lectrique pendant plus de 10 minutes avant d effectuer l...

Страница 38: ...ce pour chaudi re Ext2 X10 Interface de production pour ordinateur personnel Ext3 X1M Thermostat d ambiance Daikin Ext4 X2M Sortie d alimentation ext rieure 230 V c a Ext5 X2M R serv pas en usage X1M...

Страница 39: ...r rapport aux ouvertures pour l a ration doivent tre conformes aux r glementations nationales La chaudi re doit tre install e de mani re exposer le terminal l air externe La position du terminal doit...

Страница 40: ...gment e jusqu 19 9 m tres en r glant le param tre C3 sur 5 Reportez vous aux consignes d entretien pour cette op ration La longueur de ventouse 80 125 peut tre augment e jusqu 99 m tres en r glant le...

Страница 41: ...une valeur de longueur de coudes quivalente de la valeur de longueur de ventouse admissible Syst me de ventouse 80 125 mm Pour augmenter la longueur de conduit de combustion maximale admissible vous p...

Страница 42: ...ion maximale autoris e entre l entr e d air comburant et la sortie de gaz de combustion y compris les pressions du vent 185 Pa pour les mod les D2C T ND028 et D2C T ND035 D bit de masse minimale des p...

Страница 43: ...oivent tre obtenus par l interm diaire de Daikin Dans les unit s de type C83x le flux de condensat n est pas admis dans l unit a b d c d f g L h e a Plaque murale b Rallonge 80 mm c Adaptateur 60 100...

Страница 44: ...yez une valeur de longueur de coudes quivalente de la valeur de longueur de ventouse admissible Type B53 syst me de ventouse ouverte La chaudi re aspire de l air comburant de la pi ce d installation e...

Страница 45: ...54 60 130 EKFGS0257 Raccord de chemin e 60 100 EKFGP4678 80 125 EKFGS4828 Kit de terminal pour toit 80 mm EKFGP6864 Coude 80 mm de 90 EKFGW4085 Coude 80 mm de 45 EKFGW4086 Conduit de rallonge de 80 mm...

Страница 46: ...vous dans l cran d accueil 2 Appuyez sur les r glages partie sup rieure droite de l cran pour afficher l heure et la date de l adaptateur LAN 3 Appuyez sur Heure pour afficher une fen tre de dialogue...

Страница 47: ...8 bar 10 R glez la vanne 8 sur la position arr t D montez la boucle de remplissage si les r glementations locales l exigent 11 V rifiez que le circuit de chauffage central les raccords du circuit en...

Страница 48: ...combustion de la chaudi re 5 2 Rapport gaz air R glage non n cessaire L installateur ne doit pas r gler le rapport gaz air car la chaudi re dispose d une fonctionnalit de gaz adaptatif lectronique 5 3...

Страница 49: ...ouveau les boutons Annuler et Menu appuy s ensemble pendant cinq secondes Le mode ramoneur se d sactive et la chaudi re repasse au mode de fonctionnement normal Le mode ramoneur s arr te aussi automat...

Страница 50: ......

Страница 51: ......

Страница 52: ...MA S STEMLER SAN T C A K kbakkalk y Mah Kay da Cad No 1 Kat 21 22 34750 Ata ehir STANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr 3P469346 10J 2018 05...

Отзывы: