SiENBE04-512A
Outdoor Unit / RK(X)H-C, ARK(X)H-C, R(Y)N-C
Removal Procedure
187
3
Peel off the adhesive
tape at 2 positions of
the insulation sheet.
For prolonged durability, use
filament-reinforced adhesive
tape. (PVC tape can not be
used.)
4
Remove the insulation
sheet.
Step
Procedure
Points
In
su
l
a
tion
s
heet
Adhe
s
ive t
a
pe
(R44
38
)
SiENBE04-512A.book Page 187 Friday, October 5, 2007 1:49 PM
Содержание ARKH20CVMB7
Страница 1: ...SiENBE04 512A Service Manual Inverter Pair Wall Mounted Type C Series D Series ...
Страница 17: ...List of Functions SiENBE04 512A 8 List of Functions ...
Страница 18: ...SiENBE04 512A Specifications 9 Part 2 Specifications 1 Specifications 10 1 1 Cooling Only 10 1 2 Heat Pump 16 ...
Страница 37: ...Specifications SiENBE04 512A 28 Specifications ...
Страница 73: ...Control Specification SiENBE04 512A 64 Function and Control ...
Страница 103: ...Instruction SiENBE04 512A 94 System Configuration ...
Страница 147: ...Check SiENBE04 512A 138 Service Diagnosis ...
Страница 225: ...Outdoor Unit RK X H C ARK X H C R Y N C SiENBE04 512A 216 Removal Procedure ...
Страница 226: ...SiENBE04 512A Others 217 Part 8 Others 1 Others 218 1 1 Test Run from the Remote Control 218 1 2 Jumper Settings 219 ...
Страница 229: ...Others SiENBE04 512A 220 Others ...
Страница 241: ...Wiring Diagrams SiENBE04 512A 232 Appendix ...
Страница 245: ...SiENBE04 512A iv Index wiring diagrams 229 ...