After the installation and test operation of the room air conditioner have been completed, it
should be operated and handled as described below. Every user would like to know the correct
method of operation of the room air conditioner, to check if it is capable of cooling (or heating)
well, and to know a clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time
can be said to reduce about 80% of the requests for servicing. However good the installation
work is and however good the functions are, the customer may blame either the room air
conditioner or its installation work because of improper handling. The installation work and
handing over of the unit can only be considered to have been completed when its handling has
been explained to the user without using technical terms but giving full knowledge of the
equipment.
Содержание ARK25BVMB
Страница 10: ...SiBE04 302 List of Function 1 Part 1 List of Function 1 Functions 2 1 1 Cooling Only 2 1 2 Heat Pump 5 ...
Страница 17: ...Functions SiBE04 302 8 List of Function ...
Страница 31: ...Specifications SiBE04 302 22 Specifications ...
Страница 137: ...Check SiBE04 302 128 Service Diagnosis ...
Страница 170: ...SiBE04 302 Outdoor Unit Removal Procedure 161 2 Slide the MID upward and release Step Procedure Points ...
Страница 172: ...SiBE04 302 Outdoor Unit Removal Procedure 163 4 Remove the fan motor Step Procedure Points ...
Страница 177: ...Outdoor Unit SiBE04 302 168 Removal Procedure 2 Slide the reactor assembly this side and release Step Procedure Points ...
Страница 184: ...SiBE04 302 Others 175 Part 8 Others 1 Others 176 1 1 Explanation 176 1 2 Jumper Settings 177 ...
Страница 195: ...Wiring Diagrams SiBE04 302 186 Appendix ...
Страница 199: ...SiBE04 302 iv Index ...