
Check
SiBE04-302
126
Service Diagnosis
5.1.9
Capacitor Voltage Check
Check No.12
< Measuring method >
Before measuring, operate the unit for several minutes, then shut down the operation by force
using the circuit breaker.
If the unit is shut down using the remote controller instead of the circuit breaker, the
capacitor discharges the electric load, thus disallowing accurate measurement.
Note:
The charge section is applied with high voltage. Therefore, exercise caution during
measurement to prevent electric shock.
< Measuring positions >
Take measurements at the power transistor (+) and (-) terminals in the same way as described
in section 1.
Set the multi-tester to DC and VOLTAGE RANGE before measurement.
∗
Since capacitor (+) and (-) are connected to power transistor (+) and (-), capacitor voltage
can be measured at the power transistor (+) and (-) terminals.
5.1.10
Power Transistor Check
Check No.13
Note:
Check to make sure that the voltage between the terminal of Power transistor (+) and (-) is
approx. 0 volt before checking power transistor.
< Measuring method >
Disconnect the compressor harness connector from the outdoor unit PCB. To disengage the
connector, press the protrusion on the connector.
Then, follow the procedure below to measure resistance between power transistor (+) and (-)
and the U, V and W terminals of the compressor connector with a multi-tester. Evaluate the
measurement results for a pass/fail judgment.
<Power transistor check>
Negative (-) terminal of
tester (positive terminal
(+) for digital tester)
Power transistor
(+)
UVW
Power transistor
(-)
UVW
Positive (+) terminal of
tester (negative terminal
(-) for digital tester)
UVW
Power transistor
(+)
UVW
Power transistor
(-)
Normal resistance
Several k
Ω
to several M
Ω
(
∗
)
Unacceptable resistance
Short (0
Ω
) or open
Содержание ARK25BVMB
Страница 10: ...SiBE04 302 List of Function 1 Part 1 List of Function 1 Functions 2 1 1 Cooling Only 2 1 2 Heat Pump 5 ...
Страница 17: ...Functions SiBE04 302 8 List of Function ...
Страница 31: ...Specifications SiBE04 302 22 Specifications ...
Страница 137: ...Check SiBE04 302 128 Service Diagnosis ...
Страница 170: ...SiBE04 302 Outdoor Unit Removal Procedure 161 2 Slide the MID upward and release Step Procedure Points ...
Страница 172: ...SiBE04 302 Outdoor Unit Removal Procedure 163 4 Remove the fan motor Step Procedure Points ...
Страница 177: ...Outdoor Unit SiBE04 302 168 Removal Procedure 2 Slide the reactor assembly this side and release Step Procedure Points ...
Страница 184: ...SiBE04 302 Others 175 Part 8 Others 1 Others 176 1 1 Explanation 176 1 2 Jumper Settings 177 ...
Страница 195: ...Wiring Diagrams SiBE04 302 186 Appendix ...
Страница 199: ...SiBE04 302 iv Index ...