![Daikin ARK25BVMB Скачать руководство пользователя страница 129](http://html.mh-extra.com/html/daikin/ark25bvmb/ark25bvmb_service-manual_501295129.webp)
Check
SiBE04-302
120
Service Diagnosis
5. Check
5.1
How to Check
5.1.1
Electronic Expansion Valve Check
Check No.4
Conduct the followings to check the electronic expansion valve (EV).
1. Check to see if the EV connector is correctly inserted in the PCB. Compare the EV unit and
the connector number.
2. Turn the power off and back on again, and check to see if all the EVs generate latching
sound.
3. If any of the EVs does not generate latching noise in the above step 2, disconnect that
connector and check the conductivity using a tester.
Check the conductivity between pins 1, 3 and 6, and between pins 2, 4 and 5. If there is no
conductivity between the pins, the EV coil is faulty.
4. If no EV generates latching sound in the above step 2, the outdoor unit PCB is faulty.
5. If the conductivity is confirmed in the above step 2, mount a good coil (which generated
latching sound) in the EV unit that did not generate latching sound, and check to see if that
EV generates latching sound.
∗
If latching sound is generated, the outdoor unit PCB is faulty.
∗
If latching sound is not generated, the EV unit is faulty.
Note:
Please note that the latching sound varies depending on the valve type.
Harness 6P
6P Connector
Check
5-2
5-4
6-1
6-3
1 2 3 4 5 6
(R1082)
Содержание ARK25BVMB
Страница 10: ...SiBE04 302 List of Function 1 Part 1 List of Function 1 Functions 2 1 1 Cooling Only 2 1 2 Heat Pump 5 ...
Страница 17: ...Functions SiBE04 302 8 List of Function ...
Страница 31: ...Specifications SiBE04 302 22 Specifications ...
Страница 137: ...Check SiBE04 302 128 Service Diagnosis ...
Страница 170: ...SiBE04 302 Outdoor Unit Removal Procedure 161 2 Slide the MID upward and release Step Procedure Points ...
Страница 172: ...SiBE04 302 Outdoor Unit Removal Procedure 163 4 Remove the fan motor Step Procedure Points ...
Страница 177: ...Outdoor Unit SiBE04 302 168 Removal Procedure 2 Slide the reactor assembly this side and release Step Procedure Points ...
Страница 184: ...SiBE04 302 Others 175 Part 8 Others 1 Others 176 1 1 Explanation 176 1 2 Jumper Settings 177 ...
Страница 195: ...Wiring Diagrams SiBE04 302 186 Appendix ...
Страница 199: ...SiBE04 302 iv Index ...