9 Installation
Installer reference guide
42
EJHA EHY32AA
Daikin Altherma Hybrid hydrosplit heat pump
4P531180-1 – 2018.06
Item
Tightening torque (N•m)
X5M
0.8~0.9
9.7.4
In case of dedicated gas boiler
To connect the electrical wiring on the outdoor
unit
NOTICE
The distance between the high voltage and low voltage
cables should be at least 50 mm.
CAUTION
Do NOT push or place redundant cable length in the unit.
1
Open the top plate and the front plate. See
2
Strip insulation (20 mm) from the wires.
a
b
a
Strip wire end to this point
b
Excessive strip length may cause electrical shock or
leakage.
3
Insert the wiring at the back of the unit:
a
b
c
d
a~d
See below
4
If you insert cables through the knockout holes
c
and
d
:
▪ Punch the knockout holes using a hammer and screw driver.
▪ Insert the cable glands (delivered as accessory).
5
Inside the unit, route the wiring to the switch box as follows:
3×
a
b
c
d
a~d
See below
6
Inside the switch box, connect the wires to the appropriate
terminals.
7
After connecting all wiring, close the front plate and the top
plate.
Connections in case of dedicated gas boiler
Routing
Possible cables (depends on the installed
options)
a
Main power supply
(high voltage)
Main power supply
b
User interface (low
voltage)
User interface (mandatory option)
c
High voltage
Domestic hot water pump (field supply)
d
Low voltage
▪ Interconnection cable between outdoor
unit and gas boiler
▪ External outdoor temperature sensor
(option)
▪ LAN adapter (option)
INFORMATION
Bottom plate heater (option)
. For the routing, see the
installation manual of the bottom plate heater.
To connect the main power supply
1
Connect the main power supply to the appropriate terminals as
shown in the illustration below.