background image

6 Installation

Installation and operation manual

15

EHY32AA
Daikin Altherma hybrid monobloc – Gas boiler module
4P538953-1 – 2018.06

WARNING

Prevent hazards due to inadvertent resetting of the thermal
cut-out:  power  to  this  appliance  MUST  NOT  be  supplied
through  an  external  switching  device,  such  as  a  timer,  or
connected to a circuit that is regularly turned ON and OFF
by the utility.

NOTICE

Safety  thermostat  (normally  closed  contact)

.  The

outdoor  unit  does  not  contain  a  safety  thermostat.  Make
sure to install a field-supplied safety thermostat in the heat
emitter system according to the applicable legislation.

However, you cannot connect the feedback signal from the
safety thermostat to the outdoor unit or gas boiler because
there are no terminals for the feedback signal. Because of
this,  you  also  do  not  have  to  do  any  configuration  on  the
outdoor unit or gas boiler.

In  any  case,  to  prevent  unnecessary  tripping  of  the  safety
thermostat, it is recommended that …

▪ … the safety thermostat is automatically resettable.

▪ …  the  safety  thermostat  has  a  maximum  temperature

variation rate of 2°C/min.

▪ …  there  is  a  minimum  distance  of  2  m  between  the

safety  thermostat  and  the  motorised  3‑way  valve
delivered with the domestic hot water tank.

▪ …  the  safety  thermostat  setpoint  is  at  least  15°C

greater  than  the  maximum  leaving  water  temperature
setpoint.

6.6.1

To connect the main power supply of the
gas boiler

1

Connect the power supply cable of the gas boiler to a fuse (a)
(L: X2-2 (BRN), N: X2-4 (BLU)).

2

Connect the earthing of the gas boiler to an earthing terminal.

Result: 

The  gas  boiler  performs  a  test.    appears  on  the  service

display. After the test,   appears on the service display (wait mode).
The pressure in bar is shown on the main display.

a

X2

DANGER: RISK OF ELECTROCUTION

A fused spur or an unswitched socket MUST be located no
more than 1 m from the appliance.

CAUTION

For  installation  in  damp  rooms,  a  fixed  connection  is
obligatory. When working on the electrical circuit ALWAYS
isolate the electric supply.

6.6.2

To connect the electrical wiring to the gas
boiler

1

Open the gas boiler.

2

Open the switch box cover of the gas boiler.

3

Enter the wiring through the bottom of the unit.

a b

c

d e

f

Part

Description

Low voltage

a

Interconnection
cable between
outdoor unit and gas
boiler (current loop
PCB)

(*)

Factory-mounted
cable gland

b

Domestic hot water
tank thermistor

Knockout hole

c

Room thermostat or
heat pump
convector

Rubber grommet

High voltage

d

Power supply

Factory-mounted
cable gland

e + f

3‑way valve

Knockout hole

(*)

For more information on the current loop installation, read
the manual in the accessory bag of the current loop.

4

If  needed,  remove  the  knock-out  holes  with  a  screwdriver  and
attach the field supplied glands.

2

1

5

Connect  the  wiring  to  the  appropriate  terminals.  See

"13.2.1 Wiring diagram: Gas boiler" on page 37

.

6

Close the switch box cover of the gas boiler.

7

Close the gas boiler.

6.7

Connecting the gas piping

6.7.1

To connect the gas pipe

1

Connect  a  gas  valve  to  the  15  mm  gas  connection  of  the  gas
boiler  and  connect  it  to  the  field  pipe  according  to  local
regulations.

Содержание Altherma EHY2KOMB28AA

Страница 1: ...nstallation and operation manual Daikin Altherma hybrid monobloc Gas boiler module English Installation and operation manual Daikin Altherma hybrid monobloc Gas boiler module EHY2KOMB28AA EHY2KOMB32AA...

Страница 2: ...tting a vertical flue system 21 6 8 10 Plume management kit 21 6 8 11 Flues in voids 22 6 8 12 Flue gas materials C63 available on the market 22 6 8 13 About securing the flue system 22 6 9 Finishing...

Страница 3: ...Heat pump module Installation instructions Format Paper in the box of the outdoor unit Installation and operation manual Gas boiler module Installation and operation instructions Format Paper in the...

Страница 4: ...moke or fire CAUTION Do NOT touch the air inlet or aluminium fins of the unit NOTICE Do NOT place any objects or equipment on top of the unit Do NOT sit climb or stand on the unit NOTICE Works execute...

Страница 5: ...n in all poles providing full disconnection under overvoltage category III condition MUST be installed in the fixed wiring WARNING ONLY use copper wires Make sure the field wiring complies with the ap...

Страница 6: ...s or unauthorized modifications to the appliance flue or associated components and systems could invalidate the warranty The manufacturer accepts no liability arising from any such actions excluding s...

Страница 7: ...2 When stacking 6 boxes on one pallet no more than 2 pallets should be stacked on top of each other MAX 3 When stacking 4 boxes on one pallet no more than 3 pallets should be stacked on top of each ot...

Страница 8: ...C IPX4D Electrical protection class 5 2 Combining units and options 5 2 1 Possible options for the gas boiler Main options Part EHY2KOMB28AA EHY2KOMB32AA Boiler cover plate Cover plate to protect the...

Страница 9: ...bow PP GLV 60 100 90 EKFGP4667 Meas tee with inspection panel PP GLV 60 100 EKFGP4631 Wall bracket 100 EKFGP1292 Wall terminal Kit PP GLV 60 100 EKFGP1293 Wall terminal kit low profile PP GLV 60 100 E...

Страница 10: ...325 Connector flex flex PP 100 EKFGP5197 Chimney top PP 130 with included flue pipe EKFGS0252 Adapter flex fixed PP 130 EKFGP6353 Support bracket top inox 130 EKFGS0250 Extension flex PP 130 L 130 m A...

Страница 11: ...1 2 2 1 Open the display cover 2 Unscrew both screws 3 Tilt the front panel towards you and remove the front panel 6 1 2 To open the switch box cover of the gas boiler 1 Open the gas boiler see 6 1 1...

Страница 12: ...3 2 To install the condensate trap INFORMATION The boiler is provided with a 25 mm flexible pipe on the condensate trap Prerequisite The boiler MUST be opened before installing the condensate trap 1 F...

Страница 13: ...drainage pipe would be required to reach a suitable discharge point condensate should be removed by using a proprietary condensate pump field supply The pump outlet pipe should discharge to a suitable...

Страница 14: ...ressure is 0 1 bar A low flow 5 l min can reduce comfort Make sure to set the setpoint high enough To connect the water piping for space heating NOTICE To prevent leakages do NOT rotate existing conne...

Страница 15: ...boiler to a fuse a L X2 2 BRN N X2 4 BLU 2 Connect the earthing of the gas boiler to an earthing terminal Result The gas boiler performs a test appears on the service display After the test appears o...

Страница 16: ...c to a dual pipe connection is available 6 8 1 To change the gas boiler to 80 125 concentric connection The concentric connection can be changed from 60 100 to 80 125 by an adapter set 1 Remove the co...

Страница 17: ...y Equivalent length for concentric installation 60 100 Length m Bend 90 1 5 Bend 45 1 Equivalent length for dual pipe installation Length m R D 1 Bend 90 2 m Bend 45 1 m R D 0 5 Elbow 90 4 m Elbow 45...

Страница 18: ...pply is in the same pressure zone as the discharge For example a wall terminal through the fa ade C33 Vertical flue system Flue gas discharge via the roof Inlet opening for the air supply is in the sa...

Страница 19: ...e joint INFORMATION Flexible flue gas lines may NOT be used in horizontal connection sections INFORMATION The maximum lengths in the table below apply to each gas boiler separately C83 6 C43 5 Twin 80...

Страница 20: ...arts purchased from an external supplier MUST comply with EN14471 b NOT allowed 6 8 6 Flue pipe position See the local and national regulations Especially for UK Only use flue products approved by the...

Страница 21: ...TION Flexible flue gas lines may NOT be used in horizontal connection sections 6 8 9 Fitting a vertical flue system A vertical 60 100 mm flue kit is also available By using additional components avail...

Страница 22: ...mation for choosing the flow material by means of a sticker including an identification string The identification string contains the following information 0000 PY 2017 EN 14471 2013 T120 H1 W 1 2 O 0...

Страница 23: ...eeve Maximum distance between clamps Vertical position of pipe Other position of pipe 2000 mm 1000 mm Divide the length between the brackets evenly Every system MUST contain at least 1 bracket Positio...

Страница 24: ...splay cover 6 9 3 To install the cover plate The boiler cover plate is an optional product 7 Configuration 7 1 Gas boiler 7 1 1 Overview Configuration 1 2 7 5 6 3 4 8 a b c f e d Read out 1 On off 2 M...

Страница 25: ...ngs of the gas boiler INFORMATION Do NOT deactivate the keep hot function if the gas boiler is connected to a reversible indoor unit It is recommended to always deactivate the keep hot function if the...

Страница 26: ...e user interface instead Space heating pump post purge period 0 15 min 0 min Changing this setting has no effect on the operation of the unit Space heating pump post purge period after domestic hot wa...

Страница 27: ...A 36 Only for EHY2KOMB32AA Summer mode 1 3 0 0 Summer mode deactivated 1 Summer mode to be activated with button code on display Su 2 Summer mode to be activated with button code on display So 3 Summe...

Страница 28: ...ins power 10 Check the gas connections after the gas valve for gastightness during operation 11 Now check the setting of the CO2 percentage at high setting in display and low setting in display 12 Put...

Страница 29: ...mum value a Minimum value 8 4 7 4 9 4 9 4 a CO2 value at maximum power recorded at High setting 11 If the CO2 percentage at maximum and minimum power is within the range expressed in the tables above...

Страница 30: ...er shutdown when the required temperature is reached The boiler controller can temporarily stop the requested space heating demand The burner will stop The shutdown occurs because the requested temper...

Страница 31: ...or the heat pump module During a gas boiler test run busy will be displayed on the user interface Program Button combination Display Burner ON at minimum power and Burner ON maximum space heating pow...

Страница 32: ...remove the pipe downwards by turning the pipe alternately clockwise and counterclockwise 9 Lift the condensate drain pan on the left hand side from the connection to the condensate trap 10 Turn it to...

Страница 33: ...e socket head screws plus serrated lock washers 3 Tighten the socket head screws equally hand tight by turning the hex key clockwise 4 Fit the gas connection below the gas valve 5 Fit the connector to...

Страница 34: ...correctly set Check the adjustment See To check the carbon dioxide setting on page 28 Fan faulty Check the wiring Check the fuse If necessary replace the fan Fan dirty Clean the fan Gas valve faulty R...

Страница 35: ...ter inlet temperature is too low The domestic hot water temperature fluctuates between hot and cold The flow is too low To guarantee comfort a minimum water flow of 5 l min is recommended Increase the...

Страница 36: ...local directives laws regulations and or codes that are relevant and applicable for a certain product or domain Service company Qualified company which can perform or coordinate the required service...

Страница 37: ...inal strip X4 o Condensate drain pan p Domestic Hot water sensor S3 q Condensate S3 r Heat exchanger s Operating panel and read out t Ionisation ignition electrode u Position of data plate Bottom view...

Страница 38: ...30 0 kW Nominal load lower value a 7 1 23 7 kW 7 6 27 0 kW Output at 80 60 C Min Nom 7 1 23 1 kW 7 4 26 6 kW Output at 50 30 C Min Nom 7 7 25 4 kW 8 2 28 9 kW Nominal output 7 7 23 1 kW 8 2 26 6 kW Ef...

Страница 39: ...rical power consumption standby 2 W Radio module Power supply 230 V AC mains powered Frequency range 868 3 MHz Effective Radiated Power ERP 12 1 dBm a Maximum space heating power is set at the factory...

Страница 40: ...30 mbar Italy II2H3P G20 20 mbar G31 30 mbar United Kingdom II2H3P G20 20 mbar G31 30 37 mbar Spain II2H3P G20 20 mbar G31 30 37 mbar Austria II2H3P G20 20 mbar G31 30 50 mbar Bulgaria II2H3P G20 20 m...

Страница 41: ...ioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference GAS BOILER SYSTEM COMMISSIONING CHECKLIST...

Страница 42: ...ting co uk It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed Service Provider SERVICE RECORD SERVICE 01 AND Where Possible...

Страница 43: ...boiler module 4P538953 1 2018 06 14 Disposal NOTICE Do NOT try to dismantle the system yourself dismantling of the system treatment of the refrigerant oil and other parts MUST comply with applicable l...

Страница 44: ...89045700 4P538953 1 2018 06 Copyright 2018 Daikin...

Отзывы: