8
|
Piping installation
Installer reference guide
87
ERGA04~08EA + EHBH/X04+08EF
Daikin Altherma 3 R W
4P629085-1B – 2021.11
8 Piping installation
In this chapter
8.1 Preparing refrigerant piping
8.1.1 Refrigerant piping requirements
INFORMATION
Also read the precautions and requirements in the
Also see
"7.1.4 Special requirements for R32 units"
70] for additional
requirements.
▪
Piping length:
"7.1.3 Installation site requirements of the indoor unit"
▪
Piping material:
Phosphoric acid deoxidised seamless copper.
Содержание Altherma 3 R W
Страница 292: ...11 11 ...
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ...4P629085 1B 2021 11 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...