background image

8 Commissioning

Installation manual

36

ELBH/X12E

Daikin Altherma 3 R MT W

4P708482-1 – 2023.03

8

Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during commissioning and
hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

NOTICE

Make sure both air purge valves (one on the magnetic filter
and one on the backup heater) are open.

All  automatic  air  purge  valves  MUST  remain  open  after
commissioning.

NOTICE

Pump.

 To prevent blocking of the pump rotor, commission

the unit as quickly as possible after filling the water circuit.

INFORMATION

Protective  functions  –  "Installer-on-site  mode"

.  The

software  is  equipped  with  protective  functions,  such  as
room antifrost. The unit automatically runs these functions
when necessary.

During  installation  or  service  this  behaviour  is  undesired.
Therefore, the protective functions can be disabled:

At  first  power-on:

  The  protective  functions  are

disabled  by  default.  After  12  hours  they  will  be
automatically enabled.

Afterwards:

  An  installer  can  manually  disable  the

protective  functions  by  setting  [9.G]: 

Disable

protections

=

Yes

.  After  his  work  is  done,  he  can

enable  the  protective  functions  by  setting  [9.G]:

Disable protections

=

No

.

Also see 

"Protective functions"

 [

4

 27].

8.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The following 

field wiring

 has been carried out according

to this document and the applicable legislation:

▪ Between the local supply panel and the outdoor unit

▪ Between indoor unit and outdoor unit

▪ Between the local supply panel and the indoor unit

▪ Between the indoor unit and the valves (if applicable)

▪ Between  the  indoor  unit  and  the  room  thermostat  (if

applicable)

▪ Between  the  indoor  unit  and  the  domestic  hot  water

tank (if applicable)

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

Backup  heater  circuit  breaker

  F1B  (field  supply)  is

turned ON.

Only for tanks with built-in booster heater:

Booster  heater  circuit  breaker

  F2B  (field  supply)  is

turned ON.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

There is NO 

water leak

 inside the indoor unit.

The 

shut-off valves

 are properly installed and fully open.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

The 

air purge

 valve is open (at least 2 turns).

The 

pressure  relief  valve

  (space  heating  circuit)  purges

water when opened. Clean water MUST come out.

The 

minimum  water  volume

  is  guaranteed  in  all

conditions. See "To check the water volume and flow rate"
in 

"5.3 Preparing water piping"

 [

4

 14].

(if  applicable)  The 

domestic  hot  water  tank

  is  filled

completely.

8.2

Checklist during commissioning

The 

minimum  flow  rate

  during  backup  heater/defrost

operation  is  guaranteed  in  all  conditions.  See  "To  check
the  water  volume  and  flow  rate"  in 

"5.3  Preparing  water

piping"

 [

4

 14].

To perform an 

air purge

.

To perform a 

test run

.

To perform an 

actuator test run

.

Содержание Altherma 3 R MT W

Страница 1: ...Installation manual Daikin Altherma 3 R MT W English Installation manual Daikin Altherma 3 R MT W ELBH12E 6V ELBH12E 9W ELBX12E 6V ELBX12E 9W 1 2 3 9 A B C Z 1 2 3 9 https daikintechnicaldatahub eu...

Страница 2: ...To access the most used commands 26 7 2 Configuration wizard 27 7 2 1 Configuration wizard Language 27 7 2 2 Configuration wizard Time and date 27 7 2 3 Configuration wizard System 27 7 2 4 Configurat...

Страница 3: ...ance or an operating electric heater WARNING DO NOT reuse refrigerant piping that has been used with any other refrigerant Replace the refrigerant pipes or clean thoroughly WARNING Follow the service...

Страница 4: ...ct the backup heater power supply and the earth cable INFORMATION Details of type and rating of fuses or rating of circuit breakers are described in 6 Electrical installation 415 Commissioning see 8 C...

Страница 5: ...it at a minimum distance of 1 m from other heat sources 80 C e g electrical heater oil heater chimney and combustible materials Otherwise the unit may be damaged or in extreme cases catch fire Mind th...

Страница 6: ...minimum 1 95 m 1b 2b With chimney From floor to top of the chimney 3a Installation with chimney connected to the outside The release height is not relevant There are no requirements to the minimum fl...

Страница 7: ...charge and the given release height without chimney START PATTERN 1 PATTERN 2 PATTERN 2 Conditions ventilation openings If you want to take advantage of the floor area of the adjacent room you must p...

Страница 8: ...nv min and with the Conditions ventilation openings on previous page See table 3 For H1 Can the maximum chimney length be respected and is the chimney practically feasible See table 2 Do you need a ch...

Страница 9: ...m 7 00 m 6 39 m 6 01 m 5 76 m 5 54 m 5 33 m 5 13 m 4 95 m 4 78 m 3 45 kg 9 59 m 8 68 m 7 89 m 7 20 m 6 60 m 6 12 m 5 88 m 5 65 m 5 45 m 5 26 m 5 08 m 3 65 kg 10 73 m 9 71 m 8 83 m 8 06 m 7 39 m 6 80 m...

Страница 10: ...xample If the refrigerant charge is 3 5 kg use the table of 3 65 kg For intermediate floor areas use the column with the lower value Example If the floor area is 7 25 m use the column of 6 00 m For in...

Страница 11: ...m from the floor of the unoccupied room If the opening starts from the floor the height of the opening must be 20 mm a2 Top opening for natural ventilation between room A and the outside Must be a per...

Страница 12: ...he switch box 3 Reinstall the front panel NOTICE When closing the indoor unit cover make sure that the tightening torque does NOT exceed 4 1 N m 4 3 Mounting the indoor unit 4 3 1 To install the indoo...

Страница 13: ...use annealed material Piping diameter Liquid piping 6 4 mm 1 4 Gas piping 15 9 mm 5 8 Piping temper grade and thickness Outer diameter Temper grade Thickness t a 6 4 mm 1 4 Annealed O 0 8 mm t 15 9 m...

Страница 14: ...eck that the minimum flow rate in the installation is guaranteed in all conditions For this purpose use the differential pressure bypass valve delivered with the unit and respect the minimum water vol...

Страница 15: ...f valve and the DHW tank It is recommended to install a pressure reducing valve on the cold water inlet in accordance with the applicable legislation It is recommended to install an expansion vessel o...

Страница 16: ...connect the electricity meters 420 Domestic hot water pump See 6 3 5 To connect the domestic hot water pump 420 Alarm output See 6 3 6 To connect the alarm output 421 Space cooling heating operation c...

Страница 17: ...optional equipment Wires 2 GND Maximum running current 13 A 9 4 Booster heater Item Description LAN adapter See Installation manual of the LAN adapter Addendum book for optional equipment Wires 2 0 75...

Страница 18: ...applicable load of 15 V DC 10 mA 9 8 Benefit kWh power supply Connect X11Y to X11YB N L 5 6 B C A A 10 9 S1S 1 2 3 1N 50 Hz 230 V AC 6 3 A C B 5 6 1 2 3 X11YA X11YB X11Y X5M X1A X2M X1M X5M X2M c b a...

Страница 19: ...age systems with input current 16 A and 75 A per phase c This equipment complies with EN IEC 61000 3 11 European International Technical Standard setting the limits for voltage changes voltage fluctua...

Страница 20: ...pen valve B C A A B C A A M2S NO NC C 5 6 X2M C 21 28 X2M C 5 6 X2M C 21 29 X2M B X2M 3 Fix the cable with cable ties to the cable tie mountings 6 3 4 To connect the electricity meters Wires 2 per met...

Страница 21: ...ion below 7 9 YC Y1 X2M 1 2 3 A4P 1 2 Wires connected to the alarm output 3 Wire between X2M and A4P A4P Installation of EKRP1HBAA is required B C A A 7 Y1 C B X2M X2M A4P A4P a 7 9 Y1 YC X1M a Instal...

Страница 22: ...pen the indoor unit 411 1 Front panel 1 2 3 2 Switch box cover 3 Switch box 2 Connect the changeover to external heat source cable to the appropriate terminals as shown in the illustration below B C A...

Страница 23: ...5M X5M 3 Fix the cable with cable ties to the cable tie mountings NOTICE Make sure to select and install the safety thermostat according to the applicable legislation In any case to prevent unnecessar...

Страница 24: ...Connect the wiring as follows B C A A X5M 4 X5M 3 S4S X5M 10 X5M 9 S10S X5M 6 X5M 5 S11S 2 1 C B X5M X5M 3 4 5 6 9 10 13 14 2 Fix the cables with cable ties to the cable tie mountings In case of high...

Страница 25: ...t Grid pulse meter C B X5M X5M 3 4 13 14 3 Connect the high voltage wiring as follows B C A A L N L N X10M 1 X10M 2 X10M 3 X10M 4 2 1 1 High voltage Smart Grid contact 1 2 High voltage Smart Grid cont...

Страница 26: ...staller settings using two different methods However NOT all settings are accessible via both methods If so the corresponding table columns in this chapter are set to N A not applicable Method Column...

Страница 27: ...ON By default daylight savings time is enabled and clock format is set to 24 hours These settings can be changed during initial configuration or via the menu structure 7 2 User settings Time date 7 2...

Страница 28: ...ot water is NOT available Similarly as in Manual mode the unit can take the full load with the backup heater and or booster heater if the user activates this via the Malfunctioning main menu screen To...

Страница 29: ...p heater is adapted to be connected to most common European electricity grids The type of backup heater can be viewed but not changed Code Description 9 3 1 E 03 3 6V 4 9W Voltage For a 6V model this...

Страница 30: ...ambient temperature for cooling In Weather dependent mode the desired leaving water temperature depends on the outdoor ambient temperature Code Description 2 4 N A Setpoint mode Fixed WD heating fixed...

Страница 31: ...stop to tank heating even if the setpoint has NOT been reached Only program a storage stop when tank heating is absolutely undesirable Code Description 5 2 6 0A Comfort setpoint 30 C 6 0E C Eco setpoi...

Страница 32: ...the next temperature Confirm changes and proceed 7 3 3 Slope offset curve Slope and offset Define the weather dependent curve by its slope and offset Change the slope to differently increase or decre...

Страница 33: ...er dependent curve Zone Go to Main zone Heating 2 5 Main zone Heating WD curve Main zone Cooling 2 6 Main zone Cooling WD curve Additional zone Heating 3 5 Additional zone Heating WD curve Additional...

Страница 34: ...acts The used external room thermostat can send a separate heating cooling thermo ON OFF condition 7 4 2 Additional zone Ext thermostat type Only applicable in external room thermostat control For mor...

Страница 35: ...iority temperature Minimum running timer Anti recycle timer Maximum running timer Additional timer 9 A Energy metering Electricity meter 2 Electricity meter 1 9 B Sensors External sensor Ext amb senso...

Страница 36: ...ounted The outdoor unit is properly mounted The following field wiring has been carried out according to this document and the applicable legislation Between the local supply panel and the outdoor uni...

Страница 37: ...un Conditions Make sure all operation is disabled Go to C Operation and turn off Space heating cooling and Tank operation 1 Set the user permission level to Installer See To change the user permission...

Страница 38: ...site mode see Commissioning room frost protection will be automatically disabled for 12 hours after the first power on If the screed dryout still needs to be performed after the first 12 hours of powe...

Страница 39: ...e heating cooling Water IN screw connection 1 Thermistors a2 Space heating cooling Water OUT screw connection 1 R1T Heat exchanger Water OUT b1 Gas refrigerant IN heating mode condenser R2T Backup hea...

Страница 40: ...FF thermostat wired On OFF thermostat wireless ON OFF thermostat wireless Ext thermistor External thermistor Heat pump convector Heat pump convector Add LWT Additional leaving water temperature On OFF...

Страница 41: ...e mixing kit Bizone mixing kit Continuous Continuous current DHW pump output Domestic hot water pump output DHW pump Domestic hot water pump Electrical meters Electrical meters For HV smartgrid For hi...

Страница 42: ...10 Technical data Installation manual 42 ELBH X12E Daikin Altherma 3 R MT W 4P708482 1 2023 03 Electrical connection diagram For more details please check the unit wiring...

Страница 43: ......

Страница 44: ...4P708482 1 2023 03 Copyright 2023 Daikin 4P708482 1 0000000R Verantwortung f r Energie und Umwelt...

Отзывы: