9 Hand-over to the user
Installation manual
34
ETV23E
Daikin Altherma 3 H HT F
4P644729-1E – 2023.10
8.2.5
To perform an underfloor heating screed
dryout
Conditions:
Make sure all operation is disabled. Go to [C]:
Operation
and turn off
Space heating/cooling
and
Tank
operation.
1
Set the user permission level to Installer. See
change the user permission level"
23].
—
2
Go to [A.4]:
Commissioning
>
UFH screed dryout
.
3
Set a dryout program: go to
Program
and use the
UFH screed dryout programming screen.
4 Select
OK
to confirm.
Result:
The underfloor heating screed dryout starts.
It stops automatically when done.
To stop the test run manually:
—
1
Go to
Stop UFH screed dryout
.
2
Select
OK
to confirm.
NOTICE
To perform an underfloor heating screed dryout, room frost
protection needs to be disabled ([2‑06]=0). By default, it is
enabled ([2‑06]=1). However, due to the "installer-on-site"
mode (see "Commissioning"), room frost protection will be
automatically disabled for 12 hours after the first power-on.
If the screed dryout still needs to be performed after the
first 12 hours of power-on, manually disable room frost
protection by setting [2‑06] to "0", and KEEP it disabled
until the screed dryout has finished. Ignoring this notice will
result in cracking of the screed.
NOTICE
For the underfloor heating screed dryout to be able to start,
make sure the following settings are met:
▪ [4‑00]=1
▪ [C‑02]=0
▪ [D‑01]=0
▪ [4‑08]=0
▪ [4‑01]≠1
9
Hand-over to the user
Once the test run is finished and the unit operates properly, make
sure the following is clear for the user:
▪ Fill in the installer setting table (in the operation manual) with the
actual settings.
▪ Make sure that the user has the printed documentation and ask
him/her to keep it for future reference. Inform the user that he can
find the complete documentation at the URL mentioned earlier in
this manual.
▪ Explain the user how to properly operate the system and what to
do in case of problems.
▪ Show the user what to do for the maintenance of the unit.
▪ Explain the user about energy saving tips as described in the
operation manual.
10
Maintenance and service
NOTICE
General maintenance/inspection checklist.
Next to the
maintenance instructions in this chapter, a general
maintenance/inspection checklist is also available on the
Daikin Business Portal (authentication required).
The
general
maintenance/inspection
checklist
is
complementary to the instructions in this chapter and can
be used as a guideline and reporting template during
maintenance.
NOTICE
Maintenance MUST be done by an authorised installer or
service agent.
We recommend performing maintenance at least once a
year. However, applicable legislation might require shorter
maintenance intervals.
10.1
Overview: Maintenance and
service
This chapter contains information about:
▪ The yearly maintenance of the indoor unit
▪ Draining the domestic hot water tank
▪ Inspecting the inside of the domestic hot water tank
▪ Cleaning the water filter in case of trouble
10.2
Maintenance safety precautions
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
NOTICE: Risk of electrostatic discharge
Before performing any maintenance or service work, touch
a metal part of the unit in order to eliminate static electricity
and to protect the PCB.
10.3
Checklist for yearly maintenance of
the indoor unit
Check the following at least once a year:
▪ Water pressure
▪ Magnetic filter/dirt separator
▪ Water pressure relief valve
▪ Relief valve hose
▪ Pressure relief valve of the domestic hot water tank
▪ Switch box
▪ Descaling
▪ Chemical disinfection
▪ Pressure reducing valve
▪ Temperature and pressure relief valve
Содержание Altherma 3 H HT F ETVH16SU18E 6V Series
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ...4P644729 1E 2023 10 Copyright 2021 Daikin 4P644729 1 E 00000006 Verantwortung f r Energie und Umwelt...