System Configuration
Si12-411A
110
System Configuration
1. System Configuration
1.1
Operation Instructions
After the installation and test operation of the room air conditioner have been completed, it
should be operated and handled as described below. Every user would like to know the correct
method of operation of the room air conditioner, to check if it is capable of cooling (or heating)
well, and to know a clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time
can be said to reduce about 80% of the requests for servicing. However good the installation
work is and however good the functions are, the customer may blame either the room air
conditioner or its installation work because of improper handling. The installation work and
handing over of the unit can only be considered to have been completed when its handling has
been explained to the user without using technical terms but giving full knowledge of the
equipment.
Содержание 2MKD58BVM
Страница 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A ...
Страница 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v ...
Страница 7: ...Si12 411A vi Table of Contents ...
Страница 67: ...Specifications Si12 411A 56 Specifications ...
Страница 81: ...Printed Circuit Board Connector Wiring Diagram Si12 411A 70 Printed Circuit Board Connector Wiring Diagram ...
Страница 131: ...Instruction Si12 411A 120 System Configuration CDK X D 25 35 50 60 C Names of parts Indoor Unit 3 6 8 9 10 7 1 4 5 2 ...
Страница 173: ...Instruction Si12 411A 162 System Configuration ...
Страница 227: ...Check Si12 411A 216 Service Diagnosis ...
Страница 268: ...Si12 411A Others 257 Part 8 Others 1 Others 258 1 1 Test Run from the Remote Controller 258 1 2 Jumper Settings 259 ...
Страница 295: ...Si12 411A iv Index ...
Страница 298: ...Si12 411A Printed in Singapore 03 2005 AK COS ...