S
ETTING
W
ELDING
C
ONDITIONS
W
ELDING
C
ONDITION
C
HAPTER
6
6-20
6.6.3.3
Crater "ON" (with initial condition)
Select "CRATER-FILL ON" by the CRATER-FILL key to light on the LED of the INITIAL CONDITION
key.
•
Carry out twice the ON/OFF operation of the torch switch and carry out the welding operation. The
operation from the first ON to OFF enables the welding by the initial current, and the second ON
operation enables the welding by the crater current.
•
Even if the torch switch is switched off during welding, the signal will be self-hold. (The torch switch
should remain depressed and held during the INITIAL and CRATER phrases.)
•
When selecting "CRATER-FILL ON"
Regardless of the setting by the WELDING METHOD key, the machine automatically turns to the welding
with no pulse when the crater-fill process starts.
•
Welding method in the initial condition is the same with the main welding.
ON
OFF
ON
OFF
Initial condition
Initial current
ON
OFF
ON
OFF
Crater-fil
㫃
Crater-fill current
Torch switch
Gas flow
Output voltage
Wire feeding speed
Welding current
Main welding
Anti-stick time
Pre-flow
Post-flow
No-load voltage
Slow-down speed
Welding current
Содержание WB-M500
Страница 2: ......
Страница 8: ...TABLE OF CONTENTS vi MEMO...
Страница 28: ...PART NAMES PRODUCT SPECIFICATION AND CONFIGURATION CHAPTER 2 2 12...
Страница 52: ...WIRING OF VOLTAGE DETECTION CABLE AT BASE METAL SIDE CONNECTION CHAPTER 4 4 18...
Страница 106: ...OPERATION OF ANALOG REMOTE CONTROL OPTIONAL WELDING CONDITION CHAPTER 6 6 44...
Страница 134: ...TROUBLESHOOTING TROUBLESHOOTING CHAPTER 9 9 6...
Страница 144: ...MATERIALS FOR SETTING WELDING CONDITIONS REFERENCE MATERIALS CHAPTER 10 10 10...