Installation
6
1. After receiving the unit and putting it on the specified place of use, remove the wrapping.
2. Check the unit on eventual transport damages. In case there are some transport damages found
please inform the forwarder and your contractor. If there is no damage please go to point 3.
3. Let the unit stand for a few minutes so that the all the internal parts and components of the unit
can be stabilized.
4. Connect the mains cord to the socket.
WARNING
Place the unit on a level, horizontal surface to support the capacity of the unit
without vibration. If there is vibration, install the unit on a support material with
enough space. Small place may cause the unit to drop.
Do not install at a dangerous place.
Do not operate the unit where there are flammables. It could be caused serious
accidents like explosion or fire.
Do not operate the unit outside.
Avoid areas where the sun shines or rain directly on the unit. It is very dangerous
as cause over-heat or a short circuit.
Do not install the unit where it can get damp or dust.
It may be caused overheating, a short circuit or a fire by damp or dust inside of the
unit.
Do not use this unit when temperature fall below 5
°
C and rise above 40
°
C.