31
3-3. Spin-drying Cycle
1) Drainage
%
Drainage set time is 1min.
&
When drainage is completed, 1 minute is reduced from the overall cycle.
2) Balance Spin
Motor running during balance spin
%
Spreading the laundry : Rotating the same 45rpm with left and right direction altematively.
&
Attaching stop : Attaching the laundry to drum inside with constant speed.
'
Unbalance checking point : First step, check the U.B at 95 rpm, 160rpm
Second step,check the U.B at 95 rpm, 350rpm
Third step, at 300rpm. if the unbalance data is over the criterion
This process will be rpeated
(
Drain step : Drain at water around 160rpm
.
After drain, check the unbalance data again. This is so-called balance spin step.
3) R (Real) Spin-drying
%
'R spin-drying' refers to the process until completion of spin-drying after B spin-drying.
&
The r.p.m reached differs according to the spin-drying cycle selected.
'
When acceleration ends during spin-drying, constant-speed operation is carried out at the r.p.m set in
the selected cycle. Breaking is carried out after deceleration to app. 450 r.p.m.
(
When stopping cycle by pressing temporary stop button during spin-drying, breaking is carried out to
stop motor.
.
Max. r.p.m operation time according to spin-drying selection
4) No Drainage
%
Cycle is completed without drainage after rinsing is finished
(rpm)
Spin Level
MAX(1200)
MAX(1300)
Remark
NO SPIN
0
0
Low
550
550
Medium
850
850
High
1100
1100
Extra High
1200
1300
Содержание DWD-WD135 SERIES
Страница 48: ...47 PCB PIN ARRANGEMENT ...
Страница 60: ...59 BLDC Motor Power Transmission System of BLDC Motor ...
Страница 65: ...64 Wiring Diagram ...
Страница 71: ...70 PLATE TOP ASS Y 1 Remove 3 screws 2 Remove 4 screws ...
Страница 73: ...72 VALVE 3WAY 1 Remove 4 screws 2 Separate 3 connectors 3 Separate 3 hose clamps ...
Страница 74: ...73 MAIN PCB ASS Y 1 Separate harness and separate PCB cover 2 Separate connector 3 Remove 1 screw ...