34
2-3 Spin Sequence
1) Water discharge
1
It is done according to functional organization 3-5, water discharge sequence.
2) Balanced spin
1
Depending on the amount of water, 3 steps of unbalance checks are done. If the criteria is satisfied, then it
advances to the next stage, spin R.
2
Spin B refers to the unbalance detection area at 350 rpm. If the amount of unbalance exceeds the reference value,
then it turns back to the textile attachment region.
3
Press the pause button in the middle of spin B. It restarts at the textile unfolding region.
4
The stocking and the lingerie course omits the unbalance region of 350 rpm.
5
The hand cloth/stocking/lingerie course reduces the duration of spin B by one minute. In other courses, reduction is
two minutes.
3) R (Real) spins
1
After passing spin B, spin R continues until the entire spin operation is completed.
2
Depending on the selected spin operation, the target rpm can be varied.
3
During the standard and heavy spin operation, the unbalance value is measured to determine the final target rpm.
4
If drying is selected and medium spin is selected, then the strongest spin sequence is performed.
5
If acceleration during spins is stopped, the cycle continues at constant rpm and performs braking.
6
If you press the pause button during spins, braking will stop the motor.
4) Spins for the sports shoes
1
No spin B is performed.
2
Like the washing motor operation, it repeats on/off operation with an interval of 10 seconds for five minutes at 45
rpm.
3
To remove water, textile pulling is skipped and low temperature drying is done for 36 minutes.
4
When the cycle is completed, to clean the tub, one cycle of rinsing and medium spin is used.
5) Hand cloth spins
1
Spin B’s duration is one minute.
2
The main spin time is 1 minute. The speed changes quickly from 350 rpm to 710rpm.
3
Textile pulling is skipped. When the cycle is completed, to clean the tub, one cycle of rinsing and medium spin is
used.
6) Stocking course spins
1
Spin B’s duration is one minute.
2
Spin B reaches 160 rpm. (350rpm and ascending region omitted.)
3
The main spin’s duration is 1 minute and the motor turns at 160 rpm.
4
To reduce damage to the stocking, textile pulling is omitted.
7) Lingerie spins
1
Spin B’s duration is one minute.
2
Spin B reaches 160 rpm. (350rpm and ascending region omitted.)
3
The main spin’s duration is two minutes and the motor turns at 200 rpm.
4
To reduce damage to the lingerie, textile pulling is omitted.
Содержание DWD-UD123X
Страница 10: ...4 Parts list by ass y 8 1 PANEL F AS 1 U129 S series ...
Страница 12: ...10 1 PANEL F AS 2 U127 S series ...
Страница 16: ...14 3 CABINET F ASSY C11 C10 C07 C12 C03 C06 C09 C08 C05 C04 C01 C16 C02 C13 C14 C15 ...
Страница 18: ...16 4 CABINET ASSY ...
Страница 20: ...18 5 BASE U AS ...
Страница 22: ...20 6 TUB ASSY ...
Страница 24: ...22 7 DUCT B AS DUCT PIPE AS ...
Страница 69: ...67 1 Structure of BLDC Motor 7 HEATER BLDC MOTOR 2 Power Transmission System of BLDC Motor ...
Страница 71: ...69 8 WIRINGDIAGRAM ...