13-5
FRONT WHEEL/FRONT FORK/STEERING
INSTALLATION
●
Install the handlebars onto the front forks.
●
Install the handle pipe while aligning its grooves with
the fork top bridge holes.
●
Tighten the handle pipe pinch bolts to the specified
torque.
TORQUE : 2.6kgf
·
·
m (26N
·
·
m)
●
Install the clutch lever bracket with the “UP” mark of
the holder facing up.
●
Install the clutch lever bracket by aligning the end of
the holder with the punch mark on the handlebar.
●
Tighten the upper bolt first, then the lower bolt.
●
Connect the choke cable to the choke lever.
●
Install the winker switch housing aligning its locating
pin with the hole in the handlebar.
●
Tighten the forward screw first, then the rear screw.
●
Apply DAELIM Bond A to the inside of the grip and
to the clean surfaces of the left handlebar and throttle
grip.
●
Wait 3~5 minutes and install the grip.
●
Rotate the grip for even application of the adhesive.
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
FORK TOP BRIDGE HOLE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
HANDLE PIPE
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
PUNCH MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
“UP” MARK
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
PIN
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
HOLE
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
SWITCH HOUSING
Clean the bonding surface to avoid oil, grease or
gasoline from attaching.
Leave it for minimum 1 hour until the bond it dried.
Содержание ROADWIN VJ125 - SERVICE
Страница 3: ......
Страница 23: ...MEMO...
Страница 39: ...MEMO...
Страница 47: ...4 0 FUEL SYSTEM...
Страница 60: ...MEMO...
Страница 61: ...5 0 COOLING SYSTEM...
Страница 64: ...MEMO...
Страница 65: ...6 0 ENGINE REMOVAL INSTALLATION...
Страница 69: ...7 0 CLUTCH GEARSHIFT...
Страница 82: ...MEMO...
Страница 83: ...8 0 A C GENERATOR STARTER CLUTCH...
Страница 93: ...9 0 CYLINDER HEAD VALVES...
Страница 109: ...10 0 CYLINDER PISTON...
Страница 116: ...MEMO...
Страница 117: ...11 0 CRANKCASE TRANSMISSION CRANKSHAFT...
Страница 130: ...MEMO...
Страница 131: ...12 0 EXTERNAL PARTS...
Страница 137: ...13 0 FRONT WHEEL FRONT FORK STEERING...
Страница 161: ...14 0 REAR WHEEL REAR SUSPENSION...
Страница 174: ...MEMO...
Страница 175: ...15 0 HYDRAULIC BRAKE FRONT REAR...
Страница 200: ...MEMO...
Страница 208: ...MEMO...
Страница 216: ...MEMO...
Страница 228: ...MEMO...
Страница 241: ...MEMO...
Страница 249: ...MEMO...
Страница 250: ...MEMO...
Страница 251: ...SERVICEMANUAL 2004 1 PRINTED 2004 1 PUBLICATION NO C COPY...