ENGLISH
9
2.2
Connection to the toilet
- see fig.E-F page 63
–
The sealing ring is suitable for connecting a 100 mm toilet discharge pipe.
–
Spread some lubricating gel or liquid soap on the end of the pipe to be inserted.
–
Align the sealing ring in the direction of the end of the pipe.
–
Push the sealing ring onto the end of the pipe.
ATTENTION: the height of the toilet must be adapted so that the discharge pipe has a minimum
slope of 3%.
2.3
Connection to a wash basin -
see fig.G page 63
–
Cut the top opening with the aid of a craft knife.
–
Trim the cut part accurately so as not to leave any sharp edges.
–
Use an inlet sleeve for the cover pipe (ref.A fig.G)
–
Insert the wash basin outlet (Ø 32) in the inlet sleeve and fix it with the clamps provided (ref.B fig.G).
2.4
Preparation of the discharge pipe -
see fig.H page
63
–
Use the outlet bend and the inlet sleeve (ref.F).
–
Fit the inlet sleeve onto the outlet bend, using a fixing clamp (ref.B).
–
Align and insert the whole in the black flexible pipe as indicated in fig.G. Fix the base of the outlet bend
with a clamp.
–
If necessary, cut the outlet bend to adapt it to the corresponding diameter of the pipe.
–
We recommend fitting a discharge valve on the lowest point of the discharge pipe, so as to be able to
empty the delivery pipe when carrying out maintenance work on the system.
–
To avoid idle suction of the siphon it is necessary to provide a ventilation duct or to increase the
diameter of the horizontal outlet.
3.
ELECTRICAL CONNECTION:
Attention: always respect the safety regulations!
(e.g. DIN VDE 0100 part 701 – Damp and wet rooms, differential switches, etc….)
–
Electrical installation must be carried out by an expert, authorised electrician, who
takes on all responsibility.
–
The power socket must be applied in an appropriate way and be freely accessible.
–
The power line must be EARTHED (class I) with a high-sensitivity fuse (30 mA) and protection
calibrated at 16A.
–
If any cable is damaged it must be examined by the manufacturer or by the customer service centre since
it is a safety hazard and must be replaced immediately. Before doing any work, disconnect the power
supply to the system!
–
When connecting the electric cables the following correspondence must be strictly respected:
Brown = phase
Blue = neutral
Yellow/Green = earth
4. COMMISSIONING
–
After all the electrical and plumbing connections have been made, the connected systems may be started
up, one after the other, for a few minutes. Ensure that the connections are absolutely dry!
–
Then flush the toilet: the appliance starts automatically and works for a period of 10 to 30 seconds,
depending on the height of delivery. If the operating time is longer than 35 seconds, check that the outlet
is not bent or the ventilation hole clogged.
–
The flush tank and the valves of the connected plumbing systems must have an
absolutely perfect seal, since any leaks, even of minimum extent, cause undesired
operation of the pump.
–
Close the inspection/maintenance hatch only if all the tests performed have obtained
perfectly satisfactory results.
Содержание FEKALIFT 100-A
Страница 66: ...62 FEKALIFT 100 A FEKALIFT 200 A FIG B FIG A FIG D FIG G FIG E FIG F FIG C FIG D ...
Страница 67: ...63 FEKALIFT 300 A FIG C FIG D FIG E FIG F FIG G FIG H FIG A FIG B ...
Страница 68: ......
Страница 69: ......