13.3 Operation with sensor
In operation with a sensor the parameters must be set with the Trimmers SP and DP:
- SP represents the maximum level of the tank (L
MAX
).
- DP represents the minimum level of the tank (L
MIN
).
If the level in tank reaches the SP value the pump P1 is started, and if the opportune starting threshold is
exceeded, within a time of 5 seconds, the pump P2 is also started.
Both pumps stop when the DP level is reached.
The following table sums up the behaviour described:
Sequence
Pump P1
Pump P2
START
Tank level > = SP
Pump P1= started for at least 5 seconds and with tank level
> = SP
STOP
Tank level <= DP
Tank level
<= DP + 2%
Both with float operation and with sensor operation there will be an
automatic exchange of the order of switching on the two pumps at each start,
or an exchange between the two pumps every 24 hours, depending on the regulation
chosen in the DS_ A2.
The two pumps will always be started alternately with a minimum interval of
2 seconds between one and the other.
95%
5%
DP
DP= min. level = 25% = 1 m.
P1+P2 = ON
P1+P2 = OFF
SP= max level = 4 m
Содержание E-BOX 2G M
Страница 133: ...129 7 QS1 OFF 0 L1 L2 L3 L N 230 400 7 1 L1 L2 L3 L1 L2 L3...
Страница 137: ...133 9 0 OFF I ON 1 2 3 4 5 6 7 8 9 1 2 3 1 4 5 1 6 1 3 2 7 8 2 9 2 3...
Страница 141: ...137 24 DS_A2 2 12 12 1 2 2 1 2 1 2 12 2 3 3 1 2 1 2...
Страница 142: ...138 3 12 3 SP DP SP LMAX DP LMIN DP 1 2 SP 1 2 DP 1 5 DP SP SP 2 24 DS_A2 2 95 5 DP P1 P2 OFF P1 P2 ON DP 25 1 SP 4...
Страница 143: ...139 13 13 1 2 2 1 2 1 2 13 2 3 3 1 2 1 2...
Страница 144: ...140 13 3 SP DP SP LMAX DP LMIN SP 1 5 2 DP 1 2 SP 1 5 SP DP DP 2 24 DS_A2 2 95 5 DP P1 P2 ON P1 P2 OFF DP 25 1 SP 4...
Страница 146: ...142 14 1 R N R 2 Q1 2 Q1 0 5 2 Q1 0 5 N 2 Q1 2 Q1 2 Q1 1 2 Q1 1 R N N N 14 2 14 3 RESET RESET NO...
Страница 147: ...143 14 4 1 2 8 5 8 6 10 24 14 5 1 DS_A4 0 5 10 9 5 8 1 1 30 14 6 8 9 5 8 8 14 7 1 2 9 5 8 1 60 1 2 3 60 14 8 30 14 9...
Страница 148: ...144 15 EXP 1 16 8 2 5x20 T 100 3 4 230 10 5 EXP 1 2 3 4 5...
Страница 169: ...165 7 OFF 0 L1 L2 L3 L N QS1 230V 400V 7 1 L1 L2 L3 L1 L2 L3...
Страница 173: ...169 9 0 OFF I ON 1 2 3 4 5 6 7 8 9 1 2 3 RESET P1 4 5 P1 6 P1 3 P2 7 8 P2 9 P2 3...
Страница 177: ...173 24 DS_A2 2 12 12 1 2 2 P1 B P2 C B P1 P2 B C B B C 12 2 3 3 P1 B P2 C A B C P1 P2 B C A B C A B C...
Страница 179: ...175 13 13 1 2 2 P1 B P2 C B P1 P2 B C B C B C 13 2 3 3 P1 B P2 C P1 P2 B C A B C A B C 13 3...
Страница 180: ...176 SP DP SP LMAX DP LMIN SP P1 5 P2 DP P1 P2 SP P1 5 SP DP DP 2 24 DS_A2 2 DP m 25 1 SP 4 m 95 5 DP P1 P2 ON P1 P2 OFF...
Страница 184: ...180 15 EXP EXP 1 16 8 2 5x20 T 100mA 3 4 230VAC 10VA 5 EXP 1 2 3 4 5...
Страница 186: ......
Страница 187: ......
Страница 188: ......
Страница 189: ......
Страница 190: ......
Страница 191: ......