ENGLISH
39
7. ELECTRICAL
CONNECTIONS
Ensure that the main switch on the power
distribution panel is in OFF position (0) and that
no one can switch on the power accidentally
before connecting the power cables to the
terminals:
L1 - L2 - L3 -
for three-phase systems
L - N -
for single-phase systems
and to the insulating switch QS1.
Insert the fuse in the respective
fuse holder corresponding to the
applied voltage (230V or 300V).
Selecting the wrong fuse holder can
cause irreparable damage to the
electric panel!
Scrupulously observe all the regulations in force
concerning safety and accident prevention
.
Ensure that all the terminals are fully
tightened,
paying particular attention
to the earth screw.
Connect the cables to the terminal board as
indicated in the wiring diagrams .
Check that all the connecting cables are in
excellent condition, with the external sheathing
unbroken.
The system must be correctly and
safely earthed as required by the
regulations in force.
Check that the differential switch
that protects the system is of the
correct dimensions.
7.1
Instrumental checks to be carried out by the
installer
Continuity of the protection leads and of the main
and supplementary equipotential circuits.
Insulating resistance of the electric system
between the active circuits L1-L2-L3 (short-
circuited with each other) and the equipotential
protection circuit.
Testing the efficiency of the differential protection.
Testing the voltage applied between the active
circuits L1-L2-L3 (short-circuited with each other)
and the equipotential protection circuit.
Testing operation.
Содержание E-BOX 2G M
Страница 133: ...129 7 QS1 OFF 0 L1 L2 L3 L N 230 400 7 1 L1 L2 L3 L1 L2 L3...
Страница 137: ...133 9 0 OFF I ON 1 2 3 4 5 6 7 8 9 1 2 3 1 4 5 1 6 1 3 2 7 8 2 9 2 3...
Страница 141: ...137 24 DS_A2 2 12 12 1 2 2 1 2 1 2 12 2 3 3 1 2 1 2...
Страница 142: ...138 3 12 3 SP DP SP LMAX DP LMIN DP 1 2 SP 1 2 DP 1 5 DP SP SP 2 24 DS_A2 2 95 5 DP P1 P2 OFF P1 P2 ON DP 25 1 SP 4...
Страница 143: ...139 13 13 1 2 2 1 2 1 2 13 2 3 3 1 2 1 2...
Страница 144: ...140 13 3 SP DP SP LMAX DP LMIN SP 1 5 2 DP 1 2 SP 1 5 SP DP DP 2 24 DS_A2 2 95 5 DP P1 P2 ON P1 P2 OFF DP 25 1 SP 4...
Страница 146: ...142 14 1 R N R 2 Q1 2 Q1 0 5 2 Q1 0 5 N 2 Q1 2 Q1 2 Q1 1 2 Q1 1 R N N N 14 2 14 3 RESET RESET NO...
Страница 147: ...143 14 4 1 2 8 5 8 6 10 24 14 5 1 DS_A4 0 5 10 9 5 8 1 1 30 14 6 8 9 5 8 8 14 7 1 2 9 5 8 1 60 1 2 3 60 14 8 30 14 9...
Страница 148: ...144 15 EXP 1 16 8 2 5x20 T 100 3 4 230 10 5 EXP 1 2 3 4 5...
Страница 169: ...165 7 OFF 0 L1 L2 L3 L N QS1 230V 400V 7 1 L1 L2 L3 L1 L2 L3...
Страница 173: ...169 9 0 OFF I ON 1 2 3 4 5 6 7 8 9 1 2 3 RESET P1 4 5 P1 6 P1 3 P2 7 8 P2 9 P2 3...
Страница 177: ...173 24 DS_A2 2 12 12 1 2 2 P1 B P2 C B P1 P2 B C B B C 12 2 3 3 P1 B P2 C A B C P1 P2 B C A B C A B C...
Страница 179: ...175 13 13 1 2 2 P1 B P2 C B P1 P2 B C B C B C 13 2 3 3 P1 B P2 C P1 P2 B C A B C A B C 13 3...
Страница 180: ...176 SP DP SP LMAX DP LMIN SP P1 5 P2 DP P1 P2 SP P1 5 SP DP DP 2 24 DS_A2 2 DP m 25 1 SP 4 m 95 5 DP P1 P2 ON P1 P2 OFF...
Страница 184: ...180 15 EXP EXP 1 16 8 2 5x20 T 100mA 3 4 230VAC 10VA 5 EXP 1 2 3 4 5...
Страница 186: ......
Страница 187: ......
Страница 188: ......
Страница 189: ......
Страница 190: ......
Страница 191: ......