DGS-3000-28SC Layer 2 Managed Stackable Gigabit Switch Hardware Installation Guide
10
1. With the rough side facing down, insert the Tie Wrap into the hole below the power socket.
Figure 2-5 Insert Tie Wrap to the Switch
2. Plug the AC power cord into the power socket of the Switch.
Figure 2-6 Connect the power cord to the Switch