English
ZA-K-BSY+
99.823.99 1.1/07/11
8/20
Pin Assignment
Connection: Page 18 - 19
* if power is set on L-CLOSE
and L-OPEN simultaneously,
the drive opens in HS
YE/GN (PE)
second connecting cable
GN (SZ)
GY (SZ)
YE (SA)
WH (SA)
second connecting cable
WH (n.c.)
GY (n.c.)
YE (+SGI)
GN (-SGI)
Option -SZ-SA
GN (Data B)
YE (Data A)
BN (L - CLOSE)*
BK (L - OPEN)*
BU (N)
230
V
A
C
Option -SGI
GN (Data B)
YE (Data A)
BN (L - CLOSE)*
BK (L - OPEN)*
BU (N)
230
V
A
C
230
V
A
C
Standard
GN (Data B)
YE (Data A)
BN (L - CLOSE)*
BK (L - OPEN)*
BU (N)
Mounting examples
triangular pyramid *
domelight
pyramid *
weighty wing
Uncritical load distribution
Critical load distribution
* Guiding device required by customer in case of complete lift-off of pyramid/domelight,
because of possible lateral load due to wind pressure!