2.0
2.2
2.1
2.3
06/48
LSC 44-M4
99.823.35 1.2/06/09
Safety system for protecting human life and
material assets! Once a year functional testing
by a specialist company authorized by the
manufacturer.
Connection, mounting and functional testing by a
s p e c i a l i s t
c o m p a n y
a u t h o r i z e d
b y
t h e
manufacturer.
Green control diodes in the buttons must constantly
lighten, otherwise see “Informations for Starting”.
Repair power failure at once. Instructions of the fire
protection authorities must be always observed.
This SHEV-system has been constructed in
accordance with the latest state of the art and
science. In case of professional mounting and
maintenance it is of high operating safety.
Nevertheless, there can dangers arise from the
product, if by unqualified personell used inexpertly
or not in accordance with the regulations.
Introduction to SHEV Systems
Details about Mounting
Details to the Product
Safety Notes
Danger of Injury or Life!
central appliance
switched idle
Working on the
is only allowed, if
this is
. This includes distribution
voltage with 230V alternating voltage as well as
emergency power supply with 24V direct voltage.
Only electrical specialist companies are authorized
to install these systems, who have electrical
specialist staff with relevant experiences in
installing danger alarm systems or smoke and heat
vent systems. Only these ones can take on
responsibility for functioning, and can ensure
product liability for the whole system (see product
liability law BGBL.I S.2198 and BGB (bodily injury,
compensation for damage). Therfore, regular
maintenance and checking of functional readiness
is imperative and has to be ensured. These
Smoke and heat vent systems (SHEVs) are very
important elements of structural preventive fire
protection.
Smoke and heat vent systems are appliances of
preventive fire protection. They fulfil important
functions in case of fire as there are: protection of
human life by creating a smokefree layer, by which
escape and rescue routes will be kept free for the
fire brigade. Consequential damages by
conflagration gases are reduced and therefore
considerable material assets are often protected
from destruction. Precondition for this is, that the
system will function absolutely reliable in a case of
fire.
standard requirements are demanded according to
regulations of the DIN, of the Association of
German Insurer against damage of property (VdS)
and the respective local authorities.
In spite of greatest possible care we can not accept
responsibility for this document. All informations
given are no warranted qualification in the sense of
§ 434 BGB.
Current directions of the authorities and the VDE-
regulations must be taken into account during the
entire mounting and installation of the system.
Regulations of the local EVU must be additionally
observed. Furthermore, individual working steps
must be coordinated with the management of
works.
Should special problems arise during mounting or
operation, with which is not extensively enough
dealt with in the operating instructions, so please for
your own safety do not hesitate to consult with the
manufacturer.
Apart from suction tubes with reflux valve and air
recirculation,
nomical maintenance
warranted.
no components will be installed in
the lift shaft!
Acceptance by an expert can be can
be only obtained with this precondition as well as
with simple and eco
Unauthorized modifications and alterations at the
SHEV-system are
for safety reasons.
This operating instruction must be
before installation.
Keep to the instruction.
not allowed
read through
carefully
Please observe in any case the safety notes.
Содержание LSC-M Series
Страница 1: ...Instruction for use Lift Smoke Control LSC M System for Lift Shaft and Staircase Smoke Vent...
Страница 2: ......
Страница 51: ......