D+H CPS-M1 Скачать руководство пользователя страница 2

2/36

CPS-M1

English

99.827.31 1.4/06/18

Introduction

Your D+H service and sales partner

Safety in the building is not only provided by the product. Safety is cre-

ated above all by competence. All D+H service and sales partners are 

certified and regularly trained SHEV specialist companies. They work 

closely with D+H Mechatronic AG as the manufacturer to implement 

comprehensive system solutions for SHEV and natural building venti

-

lation. With holistic support and continuous quality assurance in every 

phase of the project: from consulting, planning and project configuration 

to installation, commissioning, maintenance and service. This means 

that the highest national and international quality standards are reliably 

fulfilled.

Installation and commissioning

The comprehensive network of D+H service and sales partners is avail

-

able to you for proper installation and commissioning. Our partner sys-

tem guarantees that D+H products are installed exclusively by trained 

and experienced technicians in compliance with the technical directives 

and regulations. Personal transfer and instruction of the operators are 

included.

Maintenance and repairs

Building operators are responsible for the functional reliability of safety 

devices in their own buildings.

Regular and proper maintenance ensures that your system will always 

be operational. As SHEV specialist companies, the D+H service and 

sales partners are optimally qualified for the maintenance. Owners/

operators can demonstrate at any time that they have fulfilled their 

obligation by means of a service contract.

Quality with a warranty

You receive extended warranty benefits for all D+H SHEV systems that 

were installed by a D+H service and sales partner and are regularly 

maintained. Ask your local D+H service and sales partner about this.

Always in your neighbourhood

We are represented around the globe with our network of subsidiaries 

and exclusive partners.

Looking for a local D+H partner?

Simply visit our website:

www.dh-partner.com

WARNING

Read all the safety information, instructions, images and technical data 

provided with this product.

Failure to observe the following instructions can result in electric shock, 

fire and/or serious injury.

Keep all the safety information and instructions in a safe place for future 

reference.

Safety information

230 V AC operating voltage!

Risk of injury from electric shock!

• 

Only an authorised, electrically skilled person is allowed to connect 

the power

• 

Keep children away from the controller

•  Only use in dry spaces

•  Only intended for installation indoors

•  Only use unaltered D+H original parts

Important regulations

It is necessary to observe VDE 0833 for danger alarm systems, VdS 

2221, VDE 0100 for electrical systems, DIN 18232 for SHEV systems, 

the provisions of the local fire brigade and of the energy supply compa

-

ny for the mains connection.

Inhalt

Important regulations .............................................................................. 2

Introduction ............................................................................................. 2

Safety information................................................................................... 2

Pictogram explanation ............................................................................ 2

Intended use ........................................................................................... 3

SHEV opening

 ........................................................................................ 3

Example of application

 ........................................................................... 3

Performance features ............................................................................. 3

Overview of components

 ........................................................................ 4

Control module – CM-BT1-D4-P2

 .......................................................... 5

Actuator module – AM-1-2-10-24-D6-D2 ................................................ 5

Digital I/O module - IOM-D1-1212 .......................................................... 5

Supply module – PSM-1-24-40 .............................................................. 5

Trigger module – TMA-1-D4-D12

 ........................................................... 5

Bistable relay module - BRM-1-COC-0006 ............................................ 5

Actuator module - AM-1-1-08-230-D4-D2............................................... 6

Power packs PS-S1-24-20 and PS-S1-24-40

 ........................................ 6

Technical data

......................................................................................... 7

24 V emergency supply

 .......................................................................... 7

Declaration of conformity ........................................................................ 7

Inner structure of standard control panels .............................................. 8

Arrangement of the modules .................................................................. 9

Installation of the module sockets

 .......................................................... 9

Removal of the module sockets

 ............................................................. 9

General instructions for connection

 ...................................................... 10

Wiring diagram (sample) ...................................................................... 10

Connection – PSM.................................................................................11

Connection – CM .................................................................................. 12

Connection – Digital inputs and outputs on CM, AM, TMA and IOM

 .... 13

Battery for the clock of the event memory

 ............................................ 13

Connection – IOM................................................................................. 14

Connection – BRM ............................................................................... 15

Connection – AM 24 ............................................................................. 16

Connection – Vent buttons to AM 24

 .................................................... 16

Connection – AM 24 with ACB drives

 ................................................... 17

Connection – AM 24 with pole-changing drives

.................................... 17

Connection – AM 230 ........................................................................... 18

Connection – NSV 401 control and vent button to AM 230

 .................. 18

Connection – 

NSV 401 power supply and D+H drives

 ......................... 19

Connection – 

NSV 401 power supply and third-party drives

 ................ 19

Connection – TMA

 ................................................................................ 20

Connection – TMA (2 lines)

 .................................................................. 21

Connection – TMA parallel connection RT

 ........................................... 22

Connection – TMA to fire alarm system (FAS)

 ..................................... 22

Description of the inputs and outputs ................................................... 23

230 V AC Emergency power supply – NSV 401

................................... 24

Schematic design – NSV 401

 ............................................................... 25

Connection overview – NSV 401

 .......................................................... 26

Connecting / changing batteries ........................................................... 27

Commissioning and configuration with the SCS software

 .................... 28

Standard configurations

........................................................................ 29

Description of the software functions

.................................................... 31

Operation - Touch panel (optional)

 ....................................................... 32

Operation - Daily ventilation ................................................................. 33

Operation - Weather automation .......................................................... 33

Operation - SHEV

 ................................................................................. 33

Operation - Trigger on alarm

 ................................................................ 34

Operation - Closing after alarm ............................................................ 34

Warranty ............................................................................................... 35

Inspection ............................................................................................. 35

Disposal ................................................................................................ 35

Maintenance and cleaning.................................................................... 35

Pictogram explanation

Control panel O.K.
Fault

SHEV alarm

Содержание CPS-M1

Страница 1: ...CPS M1 Anerkennungs Nr approval no G 517002 0786 CPD 50680 EN 12101 10 2005 Corr 1 2007 conform 99 827 31 1 4 06 18 en Original instructions Page 2...

Страница 2: ...operating voltage Risk of injury from electric shock Only an authorised electrically skilled person is allowed to connect the power Keep children away from the controller Only use in dry spaces Only...

Страница 3: ...PS M and further D H AdComNet SHEV control system Simple implementation of complex SHEV scenarios High flexibility and expandability Each control panel functions autonomously when the bus connection f...

Страница 4: ...re control sensor unit TCSU1 RJ12 31 702 70 RJ12 connecting cable 2x CC TP TCSU 1000 1 m 63 502 63 CC TP TCSU 2000 2 m 63 502 64 Touch panel with bracket optional TP C1 35 RJ12 31 702 90 Page 5 Contro...

Страница 5: ...4 V DC actuators 2 independent groups for connecting drives each with a total maximum current of 10 A The cable is monitored for breaks and short circuits via the terminal module EM 47K Each group is...

Страница 6: ...S Can be connected in parallel YES Reverse voltage protected YES Input line connection max 6 mm star max 4 mm flexible Output line connection max 16 mm star max 16 mm flexible Dimensions WxHxD 140x130...

Страница 7: ...eserve must be smaller than the capacity of the battery Standard batteries For each PS S1 24 20 PSM 2 x battery type 5 12 V 18 Ah 15 For each PS S1 24 40 PSM 2 x battery type 6 12 V 26 Ah 15 24 V emer...

Страница 8: ...MA CPS M1 060 xxxx Fig CPS M1 060 0206 Standard equipment 31 700 55 CPS M1 060 0206 CM PSM AM AM PSM AM TMA 31 700 60 CPS M1 060 0208 CM PSM AM AM PSM AM AM TMA 31 700 65 CPS M1 060 0210 CM PSM AM AM...

Страница 9: ...t of it Each additional PSM always provides power only to the modules to the right of it This applies also to the emergency battery power Therefore the modules are to be distributed evenly across the...

Страница 10: ...plying the drive Mot a Mot b For pole changing drives 1 additional wire for cable monitoring through which the SHEV high speed HS signal is also transmitted to the drive For ACB drives 2 additional wi...

Страница 11: ...E Connection PSM RJ12 connecting cable CC TP TCSU max 2 m Battery Battery No Name Description X2 1 N Output potential without an emergency supply for ventilation functions max 500 mA X2 2 Reference po...

Страница 12: ...et slave interface X5 2 ACN D X5 3 ACN D X6 5 n c n c X6 4 DI 1 1 Freely configurable digital input 0 to 28 V active minus or plus control panel OPEN factory setting can be pro grammed using SCS X6 3...

Страница 13: ...puts 24 V DC Each max 50 mA programmable using SCS Battery for the clock of the event memory The CM module has a built in lithium battery on the underside which buffers the internal clock of the event...

Страница 14: ...ly configurable digital output 3 4 X3 2 DO 3 3 freely configurable digital output 3 3 X3 3 Reference potential do not connect to P X3 4 DO 3 2 freely configurable digital output 3 2 X3 5 DO 3 1 freely...

Страница 15: ...utput 2 COM X3 1 NC 3 Floating output 3 normally closed X3 2 COM 3 Floating output 3 COM X3 3 NO 3 Floating output 3 normally open X3 4 COM 3 Floating output 3 COM X4 4 COM 4 Floating output 4 COM X4...

Страница 16: ...X3 2 ACB B 2 ACB interface of drive group 2 X3 1 ACB A 2 X4 4 SGI 1 Position transmitter for drive group 1 not yet implemented X4 3 Reference potential do not connect to P X4 2 SGI 2 Position transmit...

Страница 17: ...4 3 3 3 2 2 2 1 1 1 X1 X2 X3 X6 X5 X4 DI 1 1 DI 1 2 DO 1 1 DI 2 1 DI 2 2 DO 2 1 SGI 2 SGI 1 4 3 2 1 ACB B 2 ACB A 1 ACB A 2 ACB B 1 Mot b 2 Mot a 2 Mot b 1 E HS 1 E HS 2 P Mot a 1 P EM 47 K 2x47kW BK...

Страница 18: ...X2 4 E Monitoring wire X4 5 Reference potential do not connect to P X4 4 ACB Supply of the ACB interface not yet implemented X4 3 ACB A ACB interface of drive group not yet implemented X4 2 ACB B X4 1...

Страница 19: ...0 V AC 50 Hz L N PE ION O OFF ION O OFF before vor avant Battery Service switch off the battery Batterieschalter auf OFF schalten d brancher la batterie ION O OFF L N L N PE K1 K2 K1 K2 K1 1 2 3 4 5 6...

Страница 20: ...Freely configurable digital output 4 1 max 50 mA X6 5 DO 3 2 A Freely configurable digital output 3 2 max 50 mA X6 4 DO 3 3 S Freely configurable digital output 3 3 max 50 mA X6 3 Reference potential...

Страница 21: ...S 6 A 1 K 2 3 5 T 8 5 R 2 3 bu rd EM L01 5 R 2 3 bu rd EM L01 2 8 3 5 T n c 4 Z 7 S 6 A 1 K OK RT 45 4 Z 7 S 6 A 1 K OK 2 8 3 5 T n c RT 45 OK RT 45 OK SD O 371 FD T 271 SD O 371 FD T 271 rd bu EM L0...

Страница 22: ...Z 7 7 S S 6 6 A A 1 1 K K OK rd bu EM L01 X1 1 X1 5 X2 1 X2 5 X3 1 X3 5 5 4 3 2 1 5 4 3 2 1 TMA 1 D4 D12 5 5 5 4 4 4 3 3 3 2 1 2 1 2 1 X1 X2 X3 X6 X5 X4 5 4 3 2 1 A S n c n c T K FE Z R FE n c Z S n...

Страница 23: ...ent of 50 mA The connection is permanently short circuit resistant and the fuse used is self resetting If the output is deactivated the output is open has a high resistance Active negative inputs cann...

Страница 24: ...e by approximately 13 in order to protect the devices F Battery Mode lights up The NSV 401 runs in back up operation AC power supply not present or beyond the tole rance range If necessary the require...

Страница 25: ...x Art Nr 70 200 05 Typ 5 Same as Long WP18 12 Battery capacity 12 Ah 4 x Art Nr 70 200 00 Typ 4 Same as Long WP12 12 Technical Data Safety Notes Operating voltage 230 VAC Risk of injury from electric...

Страница 26: ...ACB B SGI 2 2 1 1 4 3 2 1 AM 1 1 08 230 D4 D2 4 4 3 3 2 2 1 1 X1 X2 X6 X5 DI 2 1 DO 2 1 DI 1 1 DI 1 2 DO 1 1 L L L N E N N L NSV 1 2 3 4 5 6 7 8 9 EM 230 N E L L 1 2 3 4 5 6 7 8 9 E N L L EM 230 L N L...

Страница 27: ...l the enclo sed fuse BF1 80A between battery A and battery B WARNING A short circuit may occur if the cover is removed 2 3 1 BF1 80A 12 V 18 Ah 12 V 18 Ah 12 V 18 Ah 12 V 18 Ah BF1 80A 12 V 12 Ah 12 V...

Страница 28: ...Service and Configuration Suite SCS is used for commissioning and programming Functions programmable via SCS Alarm with HS ATTENTION This function must only be used in conjunction with corresponding D...

Страница 29: ...odule 1 Trigger Line1 Actuator Module 1 Actuator Group 1 2 Trigger Module 1 Trigger Line2 Actuator Module 2 Actuator Group 1 2 Trigger Module 2 Trigger Line1 Actuator Module 3 Actuator Group 1 Trigger...

Страница 30: ...or Group 1 2 Trigger Module 2 Trigger Line2 Actuator Module 4 Actuator Group 1 2 Trigger Module 3 Trigger Line1 Actuator Module 5 Actuator Group 1 Trigger Module 3 Trigger Line2 Actuator Module 5 Actu...

Страница 31: ...the set ventilation time Mains outage CLOSED The group automatically moves in the CLOSED direction in the event of a mains outage Only the control panel groups move in the CLOSED direction in the eve...

Страница 32: ...ts IOM I O module Display of the module status Display of the status of the inputs and outputs Modules Overview of all modules used Display of the respective statuses similar to the LEDs on the respec...

Страница 33: ...using the smoke vent button as otherwise there is a risk of wind or water damage If gap ventilation is desired in bad weather the weather automation can be switched off using an optional automatic sw...

Страница 34: ...tion Closing after alarm Manual opening with smoke vent button Automatic opening with fire detector Automatic opening through external control e g central fire alarm For manual triggering using smoke...

Страница 35: ...ied out once a year by a specialist company authorised by the device manufacturer Carry out cleaning and maintenance work only when the system is de energised Replace the inspection plate maintain the...

Страница 36: ...eorg Sasse Str 28 32 22949 Ammersbek Germany Tel 4940 605 65 239 Fax 4940 605 65 254 E Mail info dh partner com www dh partner com 2016 D H Mechatronic AG Ammersbek Subject to technical modifications...

Отзывы: