![CYP CPHD-V4 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/cyp/cphd-v4/cphd-v4_operation-manual_2705073030.webp)
25
3) Copy VGA Sink EDID to...:
Select a Copy EDID numbered slot (C1~C10)
to copy and store the EDID from the currently connected VGA display
into that slot. The EDID name will be automatically filled in with name
data from the copied EDID.
Note: If a slot already contains EDID data, it will be overwritten by the
new EDID
4) Copy USB Stick EDID to...:
Select a Copy EDID numbered slot
(C1~C10) to copy an EDID from a USB stick. After selecting a slot, follow
the on-screen prompt and insert a FAT32 formatted USB stick containing
a single valid EDID file in the root directory (*.bin format, filename must
begin with “EDID_USER_”) and the EDID copy process will begin. The
EDID name will be automatically filled in with name data from the copied
EDID.
Note: After the EDID has been copied, whether successful or not, the unit
will automatically reboot.
5) Rename Copied Sink EDID:
Select a Copy EDID numbered slot
(C1~C10) to manually rename the EDID. Press the ▲/▼ buttons to
change the current letter and press the “Enter” button to move to the next
character. Press the “Menu” button to exit the edit mode and save the
current name.
6) Burn EDID to HDMI Sink:
Select an EDID from the list to overwrite the
EDID of the currently connected HDMI display with it.
Note: The connected display must support EDID update functionality.
7) Burn EDID to VGA Sink:
Select an EDID from the list to overwrite the
EDID of the currently connected VGA display with it.
Note: The connected display must support EDID update functionality.
Содержание CPHD-V4
Страница 1: ...Operation Manual Operation Manual 4K UHD HDMI Signal Generator Analyzer Bench Version CPHD V4...
Страница 2: ...registered trademarks of HDMI licensing Administrator Inc...
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ...CYPRESS TECHNOLOGY CO LTD www cypress com tw...