9
Cyclone Insert Installation - English
Preparation for Installation
1. Unpack range hood and check contents. Note: Be cautious
of sharp edges within the unit. Remove hood cover insert
screws and lift off cover to expose the inside (Figure 1).
2. Remove the top electrical knockout (Figure 2). Insert a
screwdriver into the knockout slot and bend the knockout
back and forth (Figure 3a & 3b). Pliers may be used to remove
the loosened knockout.
BX2000/BX2010 INSERT HOOD INSTALLATION
• Turn off power circuit at the service panel before wiring
this unit.
• All electrical work must be done by a qualified electrician
in accordance with all applicable codes and standards.
This range hood must be properly grounded.
WARNING
• At least two installers are required due to the weight and
size of the hood.
CAUTION
Electrical Knockout
Damper
Figure 2.
Figure 3a, 3b.
Figure 4.
Figure 1.
This appliance requires 120V 60Hz electrical supply and
connection to an individual properly grounded branch circuit
protected by a circuit breaker or time delay fuse.
3. For the BX2000, no damper is required. For the BX2010, place
the rectangular damper onto the top rectangular cutout and
fasten with damper screws (Figure 4).