Quick Start Procedure
Curtiss-Wright
Page 18 of 34
MNL-0661-01 Rev A1
ECO-N/A
Effective: 25 January
2016
3. Connect the DuraDBH-672 to the host PC. Use the switch management serial interface to configure
the switch, or the Processor management serial interface to configure the processor.
4. Apply
power.
5. Connect Ethernet devices to the ports on J2 and/or J3.
B
REAKOUT
C
ABLE
S
ET
You can test the DuraDBH-672 interfaces and cabling prior to installation in the target system to ensure
full operational capability. Full bench-top testing can be performed by using an appropriate cable set for
this system. CBL-DBH672-4B is available for purchase from Parvus to support lab or bench testing
purposes. You can also create a custom set of cables made specifically for the intended target system,
vehicle, or craft; refer to Chapter on Connector Descriptions for connector pinouts and descriptions.
Figure 5. DuraDBH Starter Cable Set