Ed. 0521 - 70702820 REV00 Giorgione hood - Installation
21
The company cannot be held liable for any print or transcription errors, reserving the right to make changes where deemed suitable without prior notice.
Partial reproduction without the Manufacturer’s consent is prohibited. Measurements are purely indicative and not binding.
The original language used to prepare this manual is english: the Manufacturer is not responsible for any translation/interpretation or print errors.
Pre-testing and final inspection
Before delivery to the customer, the hood is checked and test-
ed in the Manufacturer’s factories.
The “production process check sheet” enclosed with it guaran-
tees that
each
step in the production process, from assembly
to packaging, was carefully checked from both the operating
and safety standpoints.
after installing the appliance, check and mark with a “√” all the
boxes of the table on the side: this will confirm the installation
is complete and correct.
finish off explaining to the user how to use the appliance in an
optimal and safe way and how to carry out ordinary mainte-
nance and cleaning.
√
Positioning checks
Reference chapter on page...
Has the protective film been removed from the surfaces?
Is the equipment perfectly bound to the underlying oven?
Positioning and connection to the
Is the current chimney flue adequate and does it comply with the current reg-
ulations?
√
Miscellaneous
Reference chapter
Does the user have all the documentation relative to the hood?
-
Has the user been correctly trained on the use and maintenance of the hood?
-
Installation